RE: Update of Resolution 09 -33
Please find attached an update of Resolution 09 -33. As you will note under the
background section and on page two of the Resolution the monies expended toward the
completion is actually $143,774.67, not $75,387.81. Also, the wrong Supplement 1,
Exhibit A -2 and Exhibit A -3 were attached to the Resolution you received. New and
updated copies have been attached to the new attached Resolution.
We apologize for any inconvenience this may have caused.
/sl
attachment
Richard T. Flickinger Municipal Center
6101 Capulina Avenue m Morton Grove, Illinois 60053 -2985
Tel: (847) 965 -4100 Fax: (847) 965 -4162
Resolution 09 -33
RATIFYING AND AUTHORIZING THE EXECUTION OF A CHANGE ORDER TO THE
PROFESSIONAL SERVICES AGREEMENT WITH MCDONOUGH ASSOCIATES FOR
ENGINEERING & DESIGN SERVICES FOR THE LEHIGH l FERRIS TAX INCREMENT
FINANCING (TIF) REDEVELOPMENT PROJECT AREA
Introduced:
June 22, 2009
Synopsis:
This resolution will ratify the February 2008 professional services agreement with McDonough
Associates for the development of plans specifications and estimates for various public improvement
projects within the Lehigh / Ferris TIF Redevelopment Project Area and to authorize the Village
President to modify this agreement to incorporate additional tasks.
Purpose:
Ratification of a contract with McDonough Associates Inc. will authorize them to continue providing
engineering and design services for public improvements within the Lehigh/Ferris TIF District, a change
order is also needed to complete additional landscape architecture and engineering tasks identified
during the preliminary engineering phase.
Background:
In February 2008, the Corporate Authorities approved Resolution 08 -10 which approved a contract with
McDonough and Associates to develop engineering plans, specifications and estimates for the following
infrastructure projects:
1. Rehabilitation of Lincoln Ave from the eastern boundary of the District to Ferris and Ferris Ave.
from Dempster to Lincoln. including streetscaping, roadway and utility improvements.
2. Realignment of the Lincoln Ave. railroad crossing to cross the tracks in a perpendicular crossing.
New traffic signals will be installed at the intersection of Ferris and Lincoln. The old crossing will
be removed and the left over public space will be landscaped. The intersection of Lehigh and
Lincoln will be stop controlled.
3. Construction of a pedestrian railwalk within Metra ROW from Lincoln Ave. on the north to the
train station on the south. The railwalk will be installed on the east side of the Metra ROW, will
be lit and will be separated by a fence from the existing tracks.
To date, $143,774.67 has been expended toward the completion of these tasks.
Programs, Departments
Programs— Lehigh /Ferris TIF Redevelopment Project, Capital Improvement Program
or Groups Affected
Departments - Public Works, Community and Economic Development, Finance Departments
Groups — All residents
Fiscal Impact:
The change order is not to exceed $39,121.36 bring the total amount of the cost -plus fixed fee contract to
a maximum of $386,966.91.
Source of Funds:
The Village's source of the funds for this project is the municipal bond that was issued in 2007 for work
within the District.
Workload Impact:
The Public Works and Community and Economic Development Departments will perform the
management and implementation of this program as part of their normal work activities.
Administrator
Approval as presented.
Recommendation:
Second Reading:
Not required
Special Considerations None
or Requirements:
Respectfully submitted: I d Reviewed by:
Jose F. W de, Village Administrator ( •,
Prepared by�2 Reviewed by:
Bill Neuen orf, Communit an Economic Dev Director
Village Engineer
Hok'm rif,iston, Corporation Counsel
RESOLUTION 09 -33
RATIFYING AND AUTHORIZING A CHANGE ORDER
TO THE PROFESSIONAL SERVICES AGREEMENT
WITH MCDONOUGH ASSOCIATES FOR ENGINEERING AND DESIGN SERVICES
FOR THE LEHIGH /FERRIS TAX INCREMENT FINANCING (TIF)
REDEVELOPMENT PROJECT AREA
WHEREAS, the Village of Morton Grove (Village), located in Cook County, Illinois, is a home
rule unit of government under the provisions of Article 7 of the 1970 Constitution of the State of
Illinois, can exercise any power and perform any function pertaining to its government affairs,
including but not limited to the power to tax and incur debt; and
WHEREAS, in 2000, the Corporate Authorities of the Village of Morton Grove designated the
Lehigh/Ferris Avenue Tax Increment Financing (TIF) Redevelopment Project Area and established a
special tax allocation fund to improve this area; and
WHEREAS, the Corporate Authorities have determined it is in the best interest of the Village
to undertake certain improvements within this area including, but not limited to, land acquisition,
traffic signalization, streetscape, landscaping, lighting, and street improvements, building demolition,
and public infrastructure improvements; and
WHEREAS, the Corporate Authorities issued tax- exempt municipal bonds to fund various
public improvement projects in the Redevelopment District in 2007; and
WHEREAS, the following three projects were selected based on their importance to the
community and ability to be executed in a timely fashion:
1. Rehabilitation of Lincoln Avenue from the eastern boundary of the Redevelopment District to
Ferris Avenue and Ferris Avenue from Dempster Street to Lincoln Avenue. Rehabilitation will
consist of streetscaping, roadway and utility improvements.
2. Realignment of the Lincoln Avenue railroad crossing_ The roadway will be re- aligned to cross
the tracks in a perpendicular crossing. New traffic signals will be installed at the intersection of
Ferris Avenue and Lincoln Avenue. The old crossing will be removed and the remaining
public space will be landscaped. The intersection of Lehigh and Lincoln will be stop
controlled.
3. Construction of a pedestrian railwalk within Metra ROW from Lincoln Avenue on the north to
the train station on the south. The railwalk will be installed on the east side of the Metra ROW
and will be separated by a fence from the existing tracks. Lighting will also be designed in
accordance with Metra requirements.
WHEREAS, in order to complete the above three projects, engineering plans, specifications and
estimates need to be developed; and
WHEREAS, McDonough Associates was selected as the consultant through a competitive
process after the District was formed and has performed satisfactorily on work within the District; and
WHEREAS, Land Design Collaborative, the landscape architect, was selected through a formal
qualifications based selection process and who is a sub - consultant to McDonough Associates; and
WHEREAS, Kenig, Lindgren, O'Hara, Aboona, Inc. (KLOA), the transportation consultant was
selected based on their knowledge and experience of Morton Grove and previous satisfactory work and
is a sub - consultant to McDonough Associates; and
WHEREAS, the Village approved Resolution 08 -10 in February 2008 and entered into a
professional services agreement to carry out this work based on a cost -plus fixed fee contract for a
value not -to- exceed $347,845.55; and
WHEREAS, to date the Village has expended $143,774.67 towards the completion of this
work; and
WHEREAS, the streetscaping work is to be expanded to include exterior site improvements to
the Morton Grove Fire Department (6250 Lincoln Ave.) and the Morton Grove Public Library (6140
Lincoln Ave) so that these publicly -owned properties better correlate with the new streetscaping, and
WHEREAS, the viability of the pedestrian railwalk and relocation of the Metra trailer may be
impacted by the potential construction of a third track to accommodate future high speed rail between
Chicago and Milwaukee, and
WHEREAS, additional landscape architect and engineering tasks were identified in the
preliminary engineering phase to improve infrastructure projects and further beautify this area; and
WHEREAS, additional traffic study, additional meetings with Metra, and additional public
meetings are necessary to adequately complete the tasks, and
WHEREAS, the authorization of a change order is necessary to modify the scope and time -
frame for these professional services and to incorporate additional services described above.
NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF
TRUSTEES OF THE VILLAGE OF MORTON GROVE, COOK COUNTY, ILLINOIS AS FOLLOWS:
SECTION 1: The Corporate Authorities do hereby incorporate the foregoing WHEREAS
clauses into this Resolution as though fully set forth therein thereby making the findings as hereinabove
set forth.
SECTION 2: The Corporate Authorities do hereby ratify the contract between the Village of
Morton Grove and McDonough Associates originally approved by the Corporate Authorities pursuant
to Resolution 08 -10
SECTION 3: The Village President of the Village of Morton Grove is hereby authorized to
execute, and the Village Clerk to attest, a change order to modify the time frame and scope of work of
this contract as described in this resolution in an amount not to exceed $39,121.36 bringing the total
amount of the contract with McDonough Associates to an amount not -to- exceed $386,966.91.
SECTION 4: The Village Administrator, Village Engineer and Community and Economic
Development Director are hereby authorized to coordinate the implementation of this contract with
McDonough Associates and subeonsultants.
SECTION 5: This Resolution shall be in full force and effect upon its passage and approval.
PASSED this 22nd day of JUNE 2009
Trustee
Trustee
Trustee
Trustee
Trustee
Trustee
DiMaria
Gomberg
Grear
Marcus
Thill
Toth
APPROVED by me this 22nd day of JUNE 2009
Daniel J. Staackmann, Village President
Village of Morton Grove
Cook County, Illinois
ATTESTED and FILED in my office
This 23`d day of JUNE 2009
Tony S. Kalogerakos, Village Clerk
Village of Morton Grove
Cook County, Illinois
CHANGE ORDER 41
In accordance with Article 13 of the Consulting Services Contract dated February 25, 2008 ( "Contract') between
the Village of Morton Grove ( "Village ") and McDonough Associates ("Consultant"), this Change Order modifies
the Contract as follows:
1. Change in Contracted Services:
The following engineering tasks are to be added to the scope of this contract. Additional information is found
in the attached proposal dated June 2009.
Prepare and submit grant application related to rail/highway grade crossing
Prepare schematic plans for relocation of Metra service trailer and associated equipment and vehicle
parking
Prepare Maintenance of Traffic / Detour Plans for the construction phase of Lincoln and Ferris Avenues
streetscaping
The following landscape architecture tasks are to be added to the scope of this contract. Additional
information is found in the attached proposal dated March 23, 2009.
- Prepare conceptual design plans and construction documents for landscaping work to the Morton Grove
Fire Station and the Morton Grove Public Library to enhance the adjacent streetscape.
The following tasks related to traffic studies and traffic safety are to be added to the scope of this contract.
Additional information is found in the attached proposal dated April 14, 2009.
Prepared and submit rail crossing alignment and IDS to Metra and ICC for review and preliminary
approval.
Prepare additional design concepts based on staff and citizen input
Conduct updated traffic counts and sight - distance studies
Attend additional meetings with Metra, staff, and general public
2. Change in Time of Performance
The estimated timeline to complete final construction documents for Tasks 1 and 2 (Lincoln and Ferris Ave.
streetscaping and related work) shall be extended to December 31, 2009. The completion of Task 3
(pedestrian railwalk) is dependent upon Metra's potential use of the right -of -way for a third track devoted
to high -speed rail. If this Task is implemented, final construction documents shall be completed no later than
December 31, 2010.
3. Change in Consultants Compensation:
The additional engineering tasks shall not exceed $15,931.48. The additional landscape architecture tasks
shall not exceed $17,239.88. The additional traffic - related tasks shall not exceed $5,950. The total amount of
this change order shall not exceed $39,121.36.
All other terms and conditions remain unchanged.
Village of Morton Grove
Signature
Daniel J. Staackmann, ViIWa c President
Name (printed or typed)
Date
McDonough Associates (Consultant)
Signature
Name (printed or typed)
Date
McDonough Associates Inc.
130 East Randolph Street
Suite 1000
Chicago, Illinois 60601 -6214
312946-6600 Fax: 3121946 -7199
w w.maiengr.com
June 18, 2009
Mr. Bill Neuendorf
Director of Community Development
Village of Morton Grove
6101 Capulina Avenue
Morton Grove, IL 60053
Re: Lehigh /Ferris TIF District
Engineering Supplement 91
Dear Mr. Neuendorf:
McDonough Associates Inc. would like to thank the Village for the opportunity to provide engineering
services as they relate to the Lehigh /Ferris TIF improvements. Enclosed please find a proposal for
supplemental tasks that the Village has asked both McDonough Associates Inc., Land Design
Collaborative and KLOA, Inc. to perform that are out of the original scope of the previously approved
contract. The proposal is in the same format as the previous contract and continues with McDonough
Associates Inc. as the lead consultant, with Land Design Collaborative and KLOA as sub - consultants.
Please call me at (3 12) 946 -7173 or email me at nutz(@,inaiengr.com com if you have any questions regarding
this proposal. Again, we thank for the opportunity to work on this important project.
Very truly yours,
McDonough Associates Inc.
LJ K
Nathaniel K. Utz, PE
Associate
Cc: Chris Tomich, Village Engineer
James Gamble, LDC
McDonough Associates Inc. Engineering Supplement 1
Lehigh /Ferris TIF District
Village of Morton Grove
Scope of Work
The items below consist of "Out of Scope" work requested by the Village of Morton Grove for McDonough Associates Inc. (MAO to perform.
Items were determined to be "Out of Scope" based on the original approved aggreement between MAI and Marton Grove dated February 25,
2009.
TASK 1 - Miscellaneous Items
Miscellaneous items include the preparation of a Grant Application, investigate the relocation of the existing Metro trailer and material storage
yard that is north of Lincoln Avenue to one of three (3) potential locations, prepare schematic plans to show proposed site layout with
new /relocated trailer and potential parking (preferred location only, construction documents not included), Maintenance of Traffic Plans for the
Lincoln Avenue and Ferris Avenue improvements (not included in original scope).
Miscellaneous Items
1. Miscellaeraus Items Man -hours Direct Costs
Local Rail /Highway Grade Crossing grant Application 8
Metro Trailer Relocation Investigation (3 Locations 1 Detailed Schematic) 48
Maintenance of Traffic/Detour Plans (Lincoln Avenue and Ferris Avenue) _ 80
Additional Landscape Architecture Tasks T LDC
KLOA
$ 200.00
Exhibit A -2
Average Hourly Payroll Rate
McDonough Associates Inc.
100% ' $43.03 I
*IDOT Approved
Payroll Classification
Range
from
to
Rate
Used*
Percent
Participation
Weighted
Rate*
11 -
Civil Project Manager
$
44.00 1 $
60.00
$
55.04
40% !
$22.02
12
Civil Project Engineer
$
3800
55.00
$
_
42.01
25%
$10.50
14 -
Civil Engineer
$
18,00 '$
..- -
45.00
$
32.40
25%
- --
$8.10
21 -
Structural Project Manager
$
44.00 $
60.00
$
54.89
22
Structural Project Engineer
$
38 00 $
55.00
$
43.68_
24
- Structural Engineer -
$
18 00 $
45.00
$
31.74
--
31
Resident Engineer
$
24.00 $
45.00
$
40.01
32
-.
Assistant Resident Engineer
18 00 $
40.00
$
-39.01
-
- - - -_
- - - --
$
35.00
$
_26.97
38
42
Surveyor
Electrical Pro ect Engineer
j g
$
$
20.00 $
- -00
38.00 $
33W
55.00
$
$
26.11
45_94
$0 00
44
-
Electrical Engineer
$
_
18.00 i $
45.00
'+$
39.645
52-
Project Architect
36.00 $
55.00
$
38.22:
53 -
_ __$_
Senior Architect -
$ -
- 30 00 $
50.00
$
33.94
54
Architect
$_
18.00 $
45.00
$
29.63
71
Project Manager
$
38.00 $
55.00
$
53.29
72 -
_Environmental
Environmental Project Engineer
$
34 00 $
50.00
$
47.15
74 -
Environmental Engineer
$
- 18.00 I $
45.00
$
32.71
92
Technician ! Drafter
$
16.00 $
32.00
$
24.16
- 10%
$2.42
__
Clerical
$
J
11 00
$
28.00
$
--
19.52
96
- -
Prcipal
$
_
60.00 1
$
_
60.00 1
1
100% ' $43.03 I
*IDOT Approved
N
N_
N
O
O
R
a
m
m
z
m
O
O
r
a
O
6
al
ry
N
O
N
M
n
F
m Mo
m
M
N
Y
N
N
W E p
N
N
C4
�
n
O
N
N
a`
w
w
m
m
m
F
�
�
a
M
N
w
N
N
m
m
m
m
M
q
�
L
m C
N
N
W
O
U
w
0
0
m
o
0
m Q
N
O
O
= o a
N
U
W
�
w
o
o
—
OL
C
a o
e
¢O
m
IL
N
O
a
w
p
aG
N
W
fl
Q
N
N
y
L
W
x
i.
vi
ui
LU
p
a U
N
C
Y
.LC
—
jL
m
G
N
M
p
� Q
a a
r x
W
a
w
c c
� W
N
N_
N
O
O
R
a
m
m
z
m
O
O
r
a
O
6
al
O
n
m Mo
m
Y
N
W E p
N
N_
N
O
O
R
a
m
m
z
m
O
O
r
a
O
6
al
Scope of Additional Services
Morton Grove Fire Station and Library
Landscane Beautification
Understanding
Land Design Collaborative, Inc. (LDC) will provide landscape planting design plans
for the Fire Station and Library green space fronting Lincoln Avenue in the Morton
Grove Village redevelopment core area. LDC's tasks will be to identify areas of
landscape plantings by assessing sidewalks, existing vegetation, sculpture and other
features that will enhance the appearance of the Fire Station site landscape including
the green area on Lincoln Avenue and the Library front area open space.
Prepare Conceptual Design Plans
LDC will develop conceptual landscape planting design plans for the Fire Station
site and the Library green space fronting Lincoln Avenue. The planting design
will include investigating the use of native plantings and creating special planting
features in the existing open space area. These concepts will be designed to
blend with the existing basic landscape and walkways accommodating existing
and future special elements such as sculpture and /or fountains. Probable
construction costs will be estimated in this phase.
Prepare Construction Documents. Bid, and Construction Phase Services
LDC will develop construction documents and probable costs of construction for
receipt of competitive bids from construction contractors for the landscape
improvements. McDonough Engineers (MAI) Construction documents will be the
basis for these landscape planting plans which will be inserted into the
engineering documents being developed for bid.
For the project area, the Village is interested in landscape beautification
improvements, preservation of significant trees and features, sidewalks, bikeway
access and parking, and new plantings. LDC will incorporate, as appropriate, special
landscape areas features such as native plantings, rain gardens and other
sustainable "green" features into the landscape design plans.
. Landscape opportunities will be investigated for the following elements:
- streetscape design
- landmark quality trees
5142 Main Street - bike access
SkoE e, IL 60077 - pedestrian circulation and linkages
- landscape plantings
847(329-9717
office
8471329 -9779
fax
- general impact of streetscape improvements, i.e. sight lines and focal
points,
- Plazas, benches, and green space particularly at the building's front
entry,
- lighted identification sign style and location
Vcllage of Morton Grove I
Landscape Improvements March 23, 2009
Scope of Additional Services
Morton Grove Fire Station and library
Landscape Beautification
The engineering work being completed by MAI will be the basis for the development
of landscape, treatments prepared by LDC.
Scope of Services
LDC will conduct
the following
tasks
in its preparation of both the fire station and
library landscape
enhancement
plans
and specifications:
PART 1: LANDSCAPE DESIGN WORK TASKS
Task 1 Proiect Initiation Meeting with Village Staff and MDI
1.1 Receive available engineering plans and base data, aerial
photographs, reports, plans, studies, etc.
1.2 Confirm study objectives, schedule and special requirements.
1.3 Identify consultant team and Village project leaders
Task 2 Proiect Area Inventory and Analysis
2.1 Utilizing the data provided; conduct an on -site investigation and
photographic inventory of existing conditions, plantings and functions.
2.2 Using inventory data collected in Task 2.1, analyze the relationships
and physical conditions of the existing site landscape, uses, and
pedestrian.
Task 3 Design Concept and Alternatives
3.1 Prepare separate Design Concept Plans with alternatives for sub-
areas of the Fire Station and Library Landscape Plans that will
illustrate:
. Landscape design treatments that will include, sidewalks, seating,
sculpture, and adjacent street parkway areas where appropriate.
• A plant species list that reflects this project type design and
horticultural practices that incorporate native plants and sustainable
plant concepts within the existing landscape.
Village of Morton Grove
Landscape Improvements
2
March 23, 2009
Scope of Additional Services
Marton Grove Fire Station and Library
Landscape Beautification
• Site landscape design, which may include special paving, tree
preservation, entry sign, bike storage and sidewalk layout that
complement the library uses and existing architectural style.
PART 11: FINAL DESIGN & CONSTRUCTION DOCUMENT WORK ITEMS
Task 4 Design Development Plan and Cost Estimate
4.1 Prepare separate Final Landscape Design Plans (LD) for the fire
Station and Library project areas that illustrates consensus of
landscape design elements and styles developed in Task 3. These
plans will be colored for presentation purposes. Each Plan will initiate
the development of Construction Documents for landscape plantings
that may be incorporated into MAI's corridor improvements for the
entire project area.
4.2 Prepare general estimate of probable construction costs for each site
utilizing the LD as the basis.
Task 5 Construction Document Preparation
5.1 Construction Documents will be developed using the LD as the basis,
that are assumed to be bid as one package with both the Fire Station
and Library projects, and may include the following:
• Landscape planting plans, plant list and planting details.
• Sidewalk layout plans and details for special pedestrian paving,
where appropriate.
• Existing tree protection plan and details.
. Determination of style and finishes for such items as special paving,
and library identification sign.
• Technical specifications to be incorporated into MDI's documents.
5.2 Bid Packaging
Depending on the estimate of probable construction costs (Task 4),
funding and schedules, landscape bid documents will be integrated
with MAI documents for bid. with other roadway improvements
5.3 Final Estimate of Probable Construction Costs
Vi [lage ofMorton Grove
Landscape Improvements
3
March 23, 2009
Scope of Additional Services
Morton Grove Fire Station and Library
Landscape beautification
A final estimate of probable construction costs will be prepared on the
basis of the actual bid documents utilizing unit price quantity take -offs
where appropriate.
5.4 Landscape Improvements Bid Assistance - Bid services will include:
. Bid Review and Award Recommendation
PART III: MEETINGS:
Task 6 Meetings — Part
For each project, the Fire station and the Library, three (3) meetings for Part I,
Tasks 1 through 4, and one �1) meeting in Tasks 5 are included in this proposal, -
for a total of four (4) meetings for each site, for a grand total of eight (8)
meetings.
6.1 Task 6 provides for three (3) meetings in Part I, Tasks 1 through 4
included in this proposal:
Proiect Initiation Meetinq: One (1) meeting with key staff and other
stakeholders.
Design Workshop: A design workshop will be conducted with the
Village and Library staff and MAI project engineers to review
schematic concepts for the project design components with the out
come resulting in a final landscape design plan consensus,
.
Design
Concept
Review
Meetings
(1
total):
Prior to the
development
of Construction Documents,
one (1)
meeting will be
held with the
appropriate Village staff.
Task 7 Meetings — Part II
7.1 Task 7 provides for one (1) meetings in Part II, Tasks 4 and 5 for each
project included in this proposal, for a grand total of 2 meetings:
• Construction Document (CD) Preparation Review: A CD review will
occur during the construction documentation process at 50 %,
complete. A total of one (1) meeting is included in this task.
CONSTRUCTION PHASE SERVICES
Construction Phase Services, which include site visits and construction
administration, are not included in this proposal. However, LDC is prepared to
provide construction observation on a time and expense basis or, under a separate
agreement, if desired by the Village.
Village of Morton Grove 4
Landscape Improvements March 23, 2009
Scope of Additional Services
Morton Grove Fire Station and Library
Landscaos Beautification
COMPENSATION
We propose
to provide
the identified
services in both phases including
eight (8)
meetings for
the entire
project area.
The proposed fee for Part I, Final
Concept
Design Plan and Part II, the preparation of Construction Documents for the approved
Final Design Concept Plan is $16,939.88, which amount will not be exceeded without
approval.
Construction phase services are not included at this time. However, LDC is
prepared to provide an upset maximum fee and expense costs for such services, if
desired.
Direct expenses are estimated as follows:
Plan Reproductions $ 100.00
Copy Services $ 100.00
Delivery and Postage $ 100.00
Total Estimated Direct Expenses: $ 300.00
ADDITIONAL SERVICES
The following items and
tasks are
not
included
in this proposal,
but can be added for
additional compensation
based on
the
following
hourly rates for
staff:
1. Additional meetings beyond the four (4) included.
2. Sign typography, logo and banner graphic design.
Staff Hourly Rates are as follows:
Principal
Principal Associate
Senior Associate
Associate
Technical
Clerical
Village _ J Morton d
Landscape Improvements
$125.00 -
$170.00
per
hour
$
90.00
-
$125.00
per
hour
$
80.00
-
$100.00
per
hour
$
65.00
-
$ 80.00
per
hour
$
55.00
-
$ 65.00
per
hour
$
45.00
-
$ 60.00
per
hour
March 23, 2009
tf1
J
0
a
y
w
W
W LL
LL
X W
W
CL N
H
F.
OF
U J
z
Z
O
U
z
Z
0
0
4'
O
LL
NIO
Y
# FW
> Q
c p
n
v
C
O
LL
O
La
Lu
0 r
9
I
C
W
m
U
w 0
W
�M0
u a a
oz<
o �
O m
V
O
M
O
n
m
0
o
N
U)
0
0
0
0
00
00
OO
W
a
O
m LU U'v
N O
o
0
0
0
00
00
00
O p
W
V
m
N
N
N
X W LU
In
M
V
m
M
M
N
VON
FL
N
W
0000
O
O
0
0
00
OUNO
o
z °0v
0
0
0
o
m
W
M
O
O
N
M
M
0
0 C9 I'1"
N
N
C
m
M
N
N
N
OOO
W
0
�t3
Wca d'mU
CV
M
� LL
J
0000
N
0
0
f0O
O
0
rn
y ro
o
Q
CL
0
N
o
Q
N
N
N
N
VV
W
N
N
o
W
O
V
C
N
5
�
m
co
p
W
2
U
m
w
m6Q
cas
Z
IL
a
m
—_
Zc>
o
a�
o
(L
m
m
to
v
U)
a
a
W
O
a
N
V
O
LM
O
0
Z
Vl
N
0
w
mm
c
c
C9
Q
m"
.�
N
.�
O
N
C
Z
N
C
W
N
d
F 522
O
IL
(L
0
u.
W
0U���
io=ro�
9575 Wese Higgins Road, Suite 400 1 Rosemont, Illinois 60018
p: 847 -518 -9990 1 f: 847 -518 -9987
April 14, 2009
Mr. Nathaniel Utz
McDonough Associates Inc.
130 East Randolph Street, Suite 1000
Chicago, Illinois 60601
Re: Morton Grove
Dear Nathan:
As a follow up to your e -mail dated April 6, 2009 regarding the budget for the Lincoln Ferris
Subarea Project, I researched the file relative to the contract and invoices submitted and have
been able to come up with the following explanation regarding the overage.
The contract
called for
preparing three
schematics for Lincoln
Avenue. KLOA, Inc.
prepared five.
The cost
for the additional
two was approximately
$1,500.
KLOA, Inc., as requested by the Village, conducted new /updated traffic counts at the
intersection of Lincoln Avenue with Ferris and Woodland Drives. The total cost for
out -of- pocket and additional evaluation was approximately $950.
The contract called for two meetings. Several additional meetings were attended on the
following dates.
August 12, 2008 with Village staff
August 14, 2008 with Metra
August 21, 2008 with Village staff
December 17, 2008 with Village staff
January 28, 2009 - Public Meeting
The total cost for these meetings was approximately $3,500.
Based on the above, the cost for these additional services totals approximately $5,950.