HomeMy WebLinkAboutBP38668SEALC.y.. "
APPLICATION FOR BUILDING PERMIT
Date Filed: ~ /,~~ / 0 9
---°a ~
Permit Num.: ~° ,->~~..
DEPARTMENT OF BUILDINGS
Village Of Morton Grove
6101 Capulina
Marton. Grove TL 60 053
{847) 470-5214
Application is hereby made far a permit for: ~-a,E~-ex~,~--n~ d IP~s~fr~p"~~
Type:
Add' 1 Bescription: Model.:
~I ~t: $a~0 LQG„~~, ~y~ Unit #: Morton Grave IL 60053
to be errected on Lot: Block: Subdivision:
which is Tax Index ,~: Stozies: # of Sub-Units:
Value of Permit Work: $ 7, +{ So . Area: {Sq. ft. )
--~-
owner: ~+~~~~-,-~ 8~- K
Address: ~~aS ~cv~-r Dr• , S~ Iol City/State: ~Dr~a~ Grove ~ Z~--
7-""-'
Telephone: ~3~'7 -9G )-Ci 31'7-~ Zip Code: (~00 5
If Corrections are required' [,~} Call or [ ] Mail information ta:
Apglicant: ~/~, t ~t'~.~Lt5c1H - ~ ra5~ *~c• Title: pr~sr~,
Address: IDGa. 1jlu~~ G~., ~lv~(• city/State: ~~g~~, 1Z-
Telephone: u~ - Gg5 - ~t.~6 Zip Code: ~p ~ ~ o
~.ell.~ ~y 7 - 35 4 - 3 `~ ~ 9
REQUIRED SUBMISSIONS
This application must be accompanied by the following:
- PLAT OF SURVEY (2j
- PLOT PLP:.I3 (2 )
- CONSTRUCTION PLANS (3 SETS)
GEI~IERAL & SUB CON'T'RACTORS
Type: License:
Architect f) ~ ~ E~ ~ ~~
~er_era
Cantractor.~~ '-
Excavator
Name:
Telephone
rw5 tom ~c . ~ k7 - 695 - J ~ o a
L.
APPLICATION FOR BUILDING PERMIT (Continued}
SINGLE FAMILX RESIDENCE - NEWjADDITION
Type: License: Name:
E~eCtr1.C3~
~~.i~]bii.7g
Heating/A~
PROCEt~URAL CONTROL
' Page:
Telephone:
The Procedural Control regulation establishes a l4 calendar day review period
for departments and commissions to submit comments or approvals. The review
period begins upon written notif ication to departments that a val i3 building
permit application has been received. Time extensions may be granted to
accomodate review by full commissions and to departments due to extenuating
circumstances. Time extensions may also be granted if applicant has failed
to provide requested documents.
REQUIRED APPROVALS
Before a Permit is granted,
- BUILDING
- ELECTRICAL
- PLUMBING
- PUBLIC WORKS
- ENGINEERING
approval is required for the following:
REQUIRED FEES
When this permit is granted, the fallowing fees
amount of the fees will be calculated based on
- BUILDING
- STRUCTURAL ENGINEERING
- ELECTRICAL
- PLUMBING
- CERTIFICATE OF.OCCUPANCX
' - WATER FOR CONSTRUCTION
- STREET/CURB OPENING
- PARKWAY OPENINGJPAVING
- WATER MAIN TAP
- SANITARY SEWER TAP
- STORM SEWER TAP
- WATER METER _~
- STREET OPE.*iTNG DEPOSIT REFUNDABLE
- SIDEWALK DEPOSIT REFUNDABLE
- SUBTOTAL - CIVIL ENGINEERING FEE
- SUBTOTAL - WATER FUND FEES
- SUBTOTAL - BUILDING FEES
- SUBTOTAL - DEPOSITS REFUNDABLE
moist be paid. The
the plan submitted.
J.U.L.I.E.
P.rrangements shall be made fcr adequate. protection against
$ ------
S
interference with underground utilities by calling
J.U.L.I.E. 1-800-892-0123 and MORTON GROVE PUBLIC WORKS 708-4 70-5235
AT LEAST 48 HOURS BEFORE EXCAVATING OR DIGGING.
.APPLICATION FOR BUILDING PERMIT (Continued)
SINGES FAMILY RESIDENCE - NEw/ADDITION
Page:
REQUIRED INSPECTIONS
when this permit is approved, the following inspections will be made.
The applicant is required to request these inspections at least {24}
twenty four hours in advance, and their authorized agent must be gresent.
- FOOTINGS
- FOUNDATION DRAIN TILE
' - SEWER
- WATER SERVICE
- GRADE ELEVATIONS
- ROUGH FRAMING
- ROUGH ELECTRICAL
- ELECTRIC SERVICE
- ROUGH PLUMBING
- GARAGE FLOOR
- DRIVEWAY
- FINAL - BUILDING
- FINAL - ELECTRICAL
- FINAL - PLUMING
- FINAL - ENGINEERING (RFI-MSD}
- CERTIFICATE OF OCCUPANCY
- JOB CHECK
- FINALZZE PERMIT '
The undersigned hereby makes application for a permit to erect a
building/structure, etc. in the Village Of Morton Grove and in accordance
with the ordinances of the Village of Morton Grove and in accordance with
the plans and specifications herewith submitted and filed in consideration
of the issuance of this permit, and other good and. valuable considerations
the receipt of which is hereby acknowledged, we/I do hereby agree and
covenant to forever hold harmless the Village Of Morton Grave, its agents
and employees, and to save them from all costs, claims, suits, demands,.
and actions arising from or through or because of or in any way connected
with any work performed or being done in the excavation, construct ion.,
building, or finishing of the premises for which this permit is issued.
Date: `~ / ~~/dq General Contractor:
Date: ~/ate/6g
Bate : ~/ 27/~
owner:
Building
~~
BRnsco, INC,
Office: (847) 695-1.100
Fax: (847) 695-1102 1092 Bluff City Blvd.
Cell: (847) 354-3919 Elgin,lL 60120
Proposal /Acceptance
PROPOSAL SUBMITTED TO - PHONE DATE
Colliers B&K 847-967-931 Z April 17, 2009
STREET JOB NAME
8125 River 17r. Ste. 101 Lehigh Plaza-8210 Lehigh Ave.-Sealcoating-2009
CITY, STATEAND ZIP CODE JOB LOCATION
Morton Grove, IL 60053 Fax: 847-967-9313
ARCHITECT DATE OF PLANS
JOB PHONE
Attn: Allyson Massengill April of 2009
Ye herebysubmrt specrficahons and esbmates for:
This work would be done on weekends or Holidays unless other arrangements could be made.
Scope of Work:
--Clean approx. 93,450 s.f. with power blowers and hand cleaning.
--Apply two coats of coal tar emulsion sealer.
-The sealer would contain 3-5 lbs. of "Black Beauty" sand per gallon of sealer.
-The sealer would also contain "Tarmax",a latex modifier mixed in solution.
-The sealer would be applied with spraying action and the use of mechanical "squeegee machines".
-Layout and stripe all pavement markings as exist.
Cost to sealcoat and stripe------------------$7,450.00
W@ P~OpOS@ hereby to furnish material and labor -complete in accordance with above specifications, for the sum of.'
reymeni to be made as follows:
dollars
All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike '~
manneraacordingtospecificationssubmittedperstandardpractice.Anyatterationordeviatronfromabove Ruth°nied ?(1(14 S
specifications involving extra costs will be executed onlyupon written orders, and wilt become an extra Pacnn
Signature
charge overand above the estimates. A!1 agreements wntingentupon strikes, accidents ordelays beyond our
control. Owner to carry fire, tornado and other necessary insurance. Our workers ere fully covered by
' Note: This proposal maybe
WOrbnan
s Compensa(ion tnsu2nce. withdrawn by us ifnot accepted within days
Acceptance of Proposal -The above prices, specifications and conditions are
satisfactory and are hereby accepted. You are authorized to do the work as specified.
Payment will be made as outlined above. Signature
DataofACOep[ance Signature
~~>z~
~~~~~
~ ~~~~ _~
~ ~~e~e•
~~ ~~~~~
t ~~ s~
~` ~~ ~~~
aW ~~~ms=o
y~ g6<s~5
g ~ ~s~~~
s~~"~
~ _ ~ ~~
~~ ~a ~~~o~;~ a
O
Q
~ a
b
o
2p II
t0
F c
t ~-'~ `
3 Q \`
~.+ N
O ~
U ~
N ~
it
c
m
n~0
~ a~
x ~ ~
m ~
a ~ ci
3 ~ o
d
N _a cV `\
N ~ c~
~ ~ C
f0 ~ Q_1
~ ~O U
*' N L
N Q Y
~ o •3
¢NU,
(n N N Q
W ~ N U ~ ~~3
t~ `.S a ~ (e`-jl
w C ~ ~ ~
z p bq Op O
N N N ~
~~n==~
~ Q 00 CJ
i ~.
~,~
C'y'
` $e
..$
~=
_g~ 2°Y3y~, ~
=13s `~~,
•.~+~ t
:.cash
iit;eaa
~=4A10.
$ ss;eRo
S
53 ~,~~1
~s saa a.sa
oa
i