HomeMy WebLinkAboutCapitalImprovement 1997-1998VILLAGE OF MORTON GROVE VILLAGE OF MORTON GROVE
FY1998- FY2002 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY DEPARTMENT FY1998- FY2002 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY DEPARTMENT
OPERATING BUDGET
ESTIMATED COST BY FISCAL YEAR TOTAL COST ACCOUNT PAGE
RANK PROJECT NAME 1997 -98 1998 -99 1999 -2000 2000 -2001 2001 -2002 1997 -2002 PROJECT NAME NUMBER NO.
-------- ________________________ ____
DEPARTMENT OF COMMUNITY DEVELOPMENT ppp
BECKWITH RD /CHURCH ST ENGINEERING :(�W/,14,250
CAD /GIS SYSTEM 6'J.".-.1CC 20,875
LAKE STREET REHABILITATION 415,100
LOCAL STREET CRACK SEALING rA 15,000
LOCAL STREET MICRO- SEALING « yg rf40,000
LOCAL STREET PATCHING «W 35,000
LOCAL STREET RESURFACING ,nom 302,100
MILLER'S MILL ROAD STORM SEWER -`/ 16,000
NEIGHBORHOOD STREET LIGHTING 80,325
` TECHNY TRAIL BIKE PATH 6,000
WATER MAIN IMPROVEMENTS ` L% "36,300
BECKWITH ROAD-WASHINGTON /ORIOLE •`_� •"' .. «r,...,
FERNALD AVENUE RECONSTRUCTION
' GROSS POINT ROAD RECONSTRUCTION C
HARMS ROAD RECONSTRUCTION
MENARD AVENUE REHABILITATION ci c_. p �+
WAUKEGAN ROAD CORRIDOR IMPROVEMENTS /tA-,&
CHURCH STREET-UNDER/AUSTIN
' GEORG IANA/SMITHWOOD RECONSTRUCTION
` NORMANDY AVENUE RECONSTRUCTION
BECKWITH ROAD- AUSTIN/WAUKEGAN
CAPULINA RELIEF SEWER -
` BECKWITH ROAD - WAUKEGAN /ORIOLE
SCHOOL STREET RECONSTRUCTION
p FINANCE DEPARTMENT
( l TELEPHONE SYSTEM UPGRADE 46800"
COPIER REPLACEMENT
FIRE DEPARTMENT % 1
` AMBULANCE REPLACEMENT I�1- 34;000-
` ENGINE REPLACEMENT 297,000
' COMMAND VEHICLE REPLACEMENT 44,500
HEALTH AND HUMAN SERVICES
' SENIORTRAN REPLACEMENT AovLfAep
54,000
30,000
FINANCE DEPARTMENT
46,800 TELEPHONE SYSTEM UPGRADE
DEPARTMENT OF COMMUNITY DEVELOPMENT
4 -00,500
36,000
20,300
102,800
BECKWITH RD /CHURCH ST ENGINEERING
25,799
20,301
20,301
20,301
107,577
CAD /GIS SYSTEM
3,275,000
FLICKINGER CENTER REMODELING
FLICKINGER CENTER ROOF REPLACEMENT n
415,100
LAKE STREET REHABILITATION
15,000
15,000
15,000
15,000
75,000
LOCAL STREET CRACK SEALING
50,000
50,000
50,000
50,000
240,000
LOCAL STREET MICRO - SEALING
35,000
35,000
35,000
35,000
175,000
LOCAL STREET PATCHING
300,000
500,000
550,000
575,000
2,227,100
LOCAL STREET RESURFACING
258,500
65,500
236,525
274,500
MILLER'S MILL ROAD STORM SEWER
84,350
88,585
93,050
97,710
444,020
NEIGHBORHOOD STREET LIGHTING
66,000
FIRE STATION #4 ROOF REPLACEMENT
-
61,800
72,000
TECHNY TRAIL BIKE PATH
*412,800 t
670,800
462,250
224,675
1,806,825
WATER MAIN IMPROVEMENTS
228,000
PUBLIC WORKS OFFICE REMODELING "
228,000
BECKWITH ROAD - WASHINGTON /ORIOLE
24,990
PUBLIC WORKS OFFICE REMODELING
523,740
POLICE DEPARTMENT }Q r„r
548,730
FERNALD AVENUE RECONSTRUCTION
41,685
11,844
525,000
578,529
GROSS POINT ROAD RECONSTRUCTION
12,075
267,225
22,500
COMPUTER NETV�ORK
279,300
HARMS ROAD RECONSTRUCTION
405,000
60,000
405,000
MENARD AVENUE REHABILITATION
7,,yg 90,000
1,500,000
5,500 5,500
60,500
1,590,000
WAUKEGAN ROAD CORRIDOR IMPROVEMENTS
' MOBILE COMMAND CENTER A
841,500
30,000
MOBILE COMMAND CENTER
841,500
CHURCH STREET - CINDER /AUSTIN
18,000
401,500
18,000
401,500
GEORGIANA/SMITHWOOD RECONSTRUCTION
' AUTOMATIC VEHICLE LOCATOR SYSTEM
206,750r
*`
206,750
t t NORMANDY AVENUE RECONSTRUCTION
` COMPUTER -AIDED DISPATCH
(j
807,900
238,350
807,900
BECKWITH ROAD- AUSTIN/WAUKEGAN
COMPUTER -AIDED DISPATCH
.`••*`135,000
2,735,000
2,870,000
CAPULINA RELIEF SEWER
256,000
256,000
':'a BECKWITH ROAD - WAUKEGAN /ORIOLE
;_ ; >
X127 514
_ ..,..
590,378
PUBLIC WORKS DEPARTMENT ,
ALLEY PAVING ASPHALT "
577,500
577,500
'' SCHOOL STREET RECONSTRUCTION
FIRE DEPARTMENT % 1
` AMBULANCE REPLACEMENT I�1- 34;000-
` ENGINE REPLACEMENT 297,000
' COMMAND VEHICLE REPLACEMENT 44,500
HEALTH AND HUMAN SERVICES
' SENIORTRAN REPLACEMENT AovLfAep
54,000
30,000
FINANCE DEPARTMENT
46,800 TELEPHONE SYSTEM UPGRADE
30,000 COPIER REPLACEMENT
MUNICIPAL BUILDINGS
ve",�A
FIRE DEPARTMENT
134,000 AMBULANCE REPLACEMENT
297,000 ENGINE REPLACEMENT
44,500 COMMAND VEHICLE REPLACEMENT
HEALTH AND HUMAN SERVICES
54,000 SENIORTRAN REPLACEMENT
307072- 552140
027022- 572010
037052- 552290
037052- 552290
037052- 552290
307051 - 552290
307054- 552290
307073 - 552140
062036 - 572030
MUNICIPAL BUILDINGS
ve",�A
MUNICIPAL BUILDINGS
' FLICKINGER CENTER REMODELING
25,000 150,000
1,550,000
1,550,000
3,275,000
FLICKINGER CENTER REMODELING
FLICKINGER CENTER ROOF REPLACEMENT n
88,000 39,700
127,700
FLICKINGER CENTER ROOF REPLACEMENT
028024 - 554110
' PUBLIC WORKS STORAGE BIN COVERS
20,000 `
20,000
PUBLIC WORKS STORAGE BIN COVERS
e,ryX
` ""`�'t t
r
'tt r
FIRE STATION #5 EMERGENCY GENERATOR
FIRE STATION #5 EMERGENCY GENERATOR
30,700
30,700
PUBLIC WORKS PARKING LOT RESURFACING
65,500
236,525
302,025
PUBLIC WORKS PARKING LOT RESURFACING
`
e ..
FIRE STATION #4 ROOF REPLACEMENT
-
61,800
61,800
FIRE STATION #4 ROOF REPLACEMENT
' FIRE STATION #5 ROOF REPLACEMEN F
x15,900
.. x 15,900
FIRE STATION #5 ROOF REPLACEMENT
PUBLIC WORKS OFFICE REMODELING "
150,000
150,000
PUBLIC WORKS OFFICE REMODELING
POLICE DEPARTMENT }Q r„r
POLICE DEPARTMENT
`gyp COMPUTER NETWORK ✓-°^-
t
22,500
o�d`fl
22,500
COMPUTER NETV�ORK
' UVESCAN FINGERPRINT WORKSTATION bl- vin,�Lai�
60- ,000•Z
60,000
LIVESCAN FINGERPRINT WORKSTATION
' MOBILE DATA TERMINAL REPLACEMENT 27,500
11,000
5,500 5,500
60,500
MOBILE DATA TERMINAL REPLACEMENT
' MOBILE COMMAND CENTER A
t zf3 30,000- --�"�'
30,000
MOBILE COMMAND CENTER
' ANIMAL CONTROL VEHICLE
18,000
18,000
ANIMAL CONTROL VEHICLE
' AUTOMATIC VEHICLE LOCATOR SYSTEM
87,171
87,171
AUTOMATIC VEHICLE LOCATOR SYSTEM
` COMPUTER -AIDED DISPATCH
(j
238,350
238,350
COMPUTER -AIDED DISPATCH
q
PUBLIC WORKS DEPARTMENT > - `
` C
<.: / «
.., ,.
;_ ; >
X127 514
_ ..,..
590,378
PUBLIC WORKS DEPARTMENT ,
ALLEY PAVING ASPHALT "
- -
307055 552290
ALLEY PAVING- ASPHALT
p
109,000 113,360
117,894
122,610
-
,
` EQUIPMENT REPLACEMENT
°/
290,200.0" 299,000
187,000
250,000 291,000
1,317,200
EQUIPMENT REPLACEMENT
062036-572030
' CORROSION CONTROL -IEPA MANDATE
38,850-
.._._
38,850
CORROSION CONTROL -IEPA MANDATE
' STORM WATER SEPARATION
- 96,000 96,000
K000
-j
-'96000
480,000
STORM WATER SEPARATION
•e»»x, »,»,»a «» »e„x,xx,»r,
»» »»r»
x,»»ox» »»»» »»eee»e,,,,xv»ou«
FUEL MONITORING
SYSTEM
' %del_
188,900
174,100
167,800 180,300
711,100
FORM
WEWEETRE STORAGE �/� ti ,. 23858
,
»,«...». ,.......».»... ».. »,..r »r»rl:»r.
r.....,r»23,858
58
WASTE OIL STORAGE
......». W AST E OIL STO
' PUMP REPLACEMENT -NORTH STATIgp1 U
25,875 26,910
52,785
PUMP REPLACEMENT -NORTH STATION
_
----- -- - - ----- ----
------- ------ --- -
TOTAL- CAPITAL IMPROVEMENTS 51.922,300 $3,565,007
$7,448,"845
S5,471,226 55,493,410
S23,886,538
TOTAL-CAPITAL IMPROVEMENTS
CIPFY98.WK3
•
Village of Morton grove
Department of Community Development
Direct Telephone 847/470-5231
MEMORANDUM
To: Morton Grove Capital Improvement Program Committee
From: Charles S. Scheck, Director, Commu ty Developm fL1t / 47(f
Date: January 2, 1997
C1 ��!
Re: FY 1998-FY 2002 Capital Improvement Program Revisions
I have attached the pages of the proposed Capital Improvement Program which have been
modified based upon discussion at the Committee meeting on December 18 and with Village
Administrator Arft subsequently:
• FY 1998-FY 2002 Capital Improvement Program Summary by Department
• Community Development Department Projects
Harms Road Reconstruction
Local Street Resurfacing
Water Main Improvements
Beckwith Road - Washington/Oriole
Waukegan Road Corridor Improvements
Church Street - Linder/Austin
School Street Reconstruction
• Municipal Buildings Projects
Flickinger Center Roof Replacement
Public Works Office Remodeling
• Public Works Department
Waste Oil Storage
Please remove the project descriptions from the packets which were originally sent and
replace them with the revised descriptions.
Of the project descriptions included, only two (2) were not fully discussed at the December
17 meeting--"Beckwith Road - Washington/Oriole" and "Church Street - Linder/Austin".
Phasing of the Church Street/Beckwith Road Rehabilitation Project assumed that the section
of Church Street/Beckwith Road from Linder Avenue to Austin Avenue would be the first
section to be rehabilitated, with the section of Beckwith Road from Washington Street to
Oriole Avenue to be undertaken the following year, as phase two of this four phase project.
Richard T. Flickinger Municipal Center
6101 Capulina Avenue • Morton Grove, Illinois 60053-2985
Tel: (847) 965-4100 • TDD (847) 470-5249 • Fax: (847) 965-4162
After review of the Capital Improvement Program materials, Village Administrator Arft
suggested that these roadway segments be reversed in order to ensure that the Village
operating budget would be able to support the initiation of the Beckwith Road/Church Street
Rehabilitation Project. Beckwith Road from Washington Street to Oriole Avenue is
significantly less costly to the Village, since only roadway improvements are involved. The
cost to the Village for the Church Street/Beckwith Road - Linder to Austin section is very
high due to the required replacement of the combined sewer line in Church Street, from
Menard Avenue to Linder Avenue, the cost of which is not eligible for federal or state
participation. Village Administrator Arft indicated that by modifying the sequence of
improvements in the Beckwith/Church corridor, the Village would be better able to support
the higher cost project through alternative financing mechanisms. Do you have any problems
with the revision to the implementation schedule proposed? If so, please contact either
Village Administrator Arft or me immediately.
If you have any questions about the attached materials or if you wish to discuss the revised
materials in a meeting, please contact me immediately.
CSS:dn
Attachments
2
VILLAGE OF MORTON GROVE
FY1998- FY2002 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY DEPARTMENT
ESTIMATED COST BY FISCAL YEAR
RANK - PROJECT NAME 1997 -98 1998 -99 1999 -2000 2000 -2001
VILLAGE OF MORTON GROVE
FY1998- FY2002 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY DEPARTMFSIT ^ - -'
OPERATING BUDGET
TOTAL COST ACCOUNT PAGE
2001 -2002 1997 -2002 PROJECT NAME NUMBER NO.
307072- 552140.
027022- 572010
DEPARTMENT OF COMMUNITY DEVELOPMENT
POLICE DEPARTMENT
` TELEPHONE SYSTEM UPGRADE
,.............» ..............................««...............,...........
46,800
...............................
DEPARTMENT OF COMMUNITY DEVELOPMENT
' BECKWITH RD /CHURCH ST ENGINEERING
46,500 14,250
36,000
20,300
22,500
117,050
BECKWITH RD /CHURCH ST ENGINEERING
' CAD /GIS SYSTEM
25,422 25,799
20,301
20,301
20,301
112,124
CAD /GIS SYSTEM
HARMS ROAD RECONSTRUCTION
12,075
267,225
' SENIORTRAN REPLACEMENT
60,000
267,225
HARMS ROAD RECONSTRUCTION
' LAKE STREET REHABILITATION
346,500
FLICKINGER CENTER REMODELING
25,000
150,000
346,500
LAKE STREET REHABILITATION
' LOCAL STREET CRACK SEALING
15,000 15,000
15,000
15,000
15,000
75,000
LOCAL STREET MICRO- SEALING
' LOCAL STREET MICRO - SEALING
50,000 50,000
50,000
50,000
50,000
250,000
LOCAL STREET MICRO-SEALING
' LOCAL STREET PATCHING
50,000 35,000
35,000
35,000
35,000
190,000
LOCAL STREET MICRO - SEALING
LOCAL STREET RESURFACING
727,500 300,000
500,000
550,000
575,000
2,652,500
LOCAL STREET RESURFACING
' MILLER'S MILL ROAD STORM SEWER
16,000 258,500
238,350
274,500
MILLER'S MILL ROAD STORM SEWER
• NEIGHBORHOOD STREET LIGHTING
80,325 84,350
88,585
93,050
97,710
444,020
NEIGHBORHOOD STREET LIGHTING
- TECHNY TRAIL BIKE PATH
6,000 66,000
PUBLIC WORKS DEPARTMENT
72,000
TECHNY TRAIL BIKE PATH
WATER MAIN IMPROVEMENTS
...................................................................«..........»...,...,...,....,.,,.,........................................,.,..............................................................................................................
36,300 412,800
670,800
462,250
224,675
1,806,825
WATER MAIN IMPROVEMENTS
...........,.,.............,...
BECKWITH ROAD - WASHINGTON /ORIOLE
228,000
299,000
187,000
250,000
228,000
BECKWITH ROAD - WASHINGTON /ORIOLE
' FERNALD AVENUE RECONSTRUCTION
24,990
' CORROSION CONTROL -IEPA MANDATE
523,740
548,730
FERNALD AVENUE RECONSTRUCTION
` GROSS POINT ROAD RECONSTRUCTION
41,685
11,844
525,000
` FUEL STORAGE MONITORING SYSTEM
578,529
GROSS POINT ROAD RECONSTRUCTION
' MENARD AVENUE REHABILITATION
405,000
35,790
FUEL STORAGE MONITORING
405,000
MENARD AVENUE REHABILITATION
WAUKEGAN ROAD CORRIDOR IMPROVEMENTS
..........................................................................................................................................................................»»....................................
90,000
1,500,000
96,000
96,000
1,590,000
......... »..................... «»..... ...............................
' CHURCH STREET- LINDER/AUSTIN
... ........ . .... .............................. . ..............................
SEWER REHAB- INSITUFORM
841,500
.... .........................................
188,900
174,100
841,500
CHURCH STREET- LINDER/AUSTIN
GEORG IANA/SMITHWOOD RECONSTRUCTION
... ............... ................................................ ...................
SEWER REHAB- INSITUFORM
401,500
-
.........................................
401,500
GEORGIANA/SMITHWOOD RECONSTRUCTION
' NORMANDY AVENUE RECONSTRUCTION
..................................................".,...,„................................,,..................................,...........................
.... ...........
206,750(
............................
206,750
».. ...........
NORMANDY AVENUE RECONSTRUCTION
,....... ................................................ .. ..... .....................
' BECKWITH ROAD- AUSTINANAUKEGAN
25,875
807,900
52,785
807,900
BECKWITH ROAD - MASON /LEHIGH
` CAPULINA RELIEF SEWER
135,000 1
2,735,000
2,870,000
CAPULINA RELIEF SEWER
SCHOOL STREET RECONSTRUCTION
.......................................«...,....,.,.....,.................................................................,..,....
.............................................
577,500
...........
577,500
- ...........
SCHOOL STREET RECONSTRUCTION
... ........ ..........................................................................
` BECKWITH ROAD - WAUKEGAN /ORIOLE
256,000
256,000
BECKWITH ROAD - LEHIGH /ORIOLE
FINANCE DEPARTMENT
POLICE DEPARTMENT
` TELEPHONE SYSTEM UPGRADE
,.............» ..............................««...............,...........
46,800
...............................
` COPIER REPLACEMENT
POLICE DEPARTMENT
FIRE DEPARTMENT
` COMPUTER NETWORK
22,500
AMBULANCE REPLACEMENT
........................««.».........«,.......... ...................-........,..
134,000 ..................
' ENGINE REPLACEMENT
22,500
297,000
.......... ...............................»»..».......... .............................
` COMMAND VEHICLE REPLACEMENT
»» ....................
60,000
HEALTH AND HUMAN SERVICES
' SENIORTRAN REPLACEMENT
60,000
54,000
MUNICIPAL BUILDINGS
` MOBILE DATA TERMINAL REPLACEMENT
.............................................................................
11,000
.............................................».».....................
FLICKINGER CENTER REMODELING
25,000
150,000
FLICKINGER CENTER ROOF REPLACEMENT
88,000
39,700
` PUBLIC WORKS PARKING LOT RESURFACING
65,500
236,525
' PUBLIC WORKS STORAGE BIN COVERS
20,000
FIRE STATION #5 EMERGENCY GENERATOR 30,700
` FIRE STATION #4 ROOF REPLACEMENT
....................................................................................... ...............................
` FIRE STATION #5 ROOF REPLACEMENT
PUBLIC WORKS OFFICE REMODELING
FINANCE DEPARTMENT
46,800 TELEPHONE SYSTEM UPGRADE
............... ..- ....................... ........... ... ................................... .,.
30,000 30,000 COPIER REPLACEMENT
FIRE DEPARTMENT
134,000 AMBULANCE REPLACEMENT
........ .. ..... » ............ ................................. . ......... ........,,,» ................................................. ,..,.............
,.,.
297,000 ENGINE REPLACEMENT
» ................. ..............................» ......................................................................... ...............................
44,500 , 44,500 COMMAND VEHICLE REPLACEMENT
HEALTH AND HUMAN SERVICES
54,000 i SENIORTRAN REPLACEMENT
1,550,000 1,550,000 3,275,000
127,700
302,025
20,000
............................................ ...............................
30,700
............" ............................. ............................ »..
61,800 61,800
.............. ..... .............. ............... .,. _...................-
15,900 15,900
................"................«......... ..........,,.............,.....
150,000 150,000
MUNICIPAL BUILDINGS
FLICKINGER CENTER REMODELING
FLICKINGER CENTER ROOF REPLACEMENT
PUBLIC WORKS PARKING LOT RESURFACING
............. . ........................... .. ......... .....,..........
FIRE STATION #5 EMERGENCY GENERATOR
, ............. __............ ...............................
FIRE STATION #4 ROOF REPLACEMENT
......" ...... ............................... - ....... . ..........
...
FIRE STATION #5 ROOF REPLACEMENT
..... «., ....................... . ...... . ... . ........ .... .... ... ....
PUBLIC WORKS OFFICE REMODELING
037052 - 552290
037052 - 552290
037052- 552290
307051 - 552290
307054 - 552290
307073 - 552140
062036 - 572030
028024- 554110 _
307055 - 552290
062036 - 572030
_____ ----------------- _______- ___- ______________ ----------- ======== ------------ - ________ ____ ___--____________ _________________- ____- ______ -_ _____ - _________
TOTAL - CAPITAL IMPROVEMENTS $2,454,262 $3,655,917 $7,212,320 $5,471,226 $5,493,410 $24,275,060 TOTAL - CAPITAL IMPROVEMENTS CIPFY98.WK3
li
POLICE DEPARTMENT
POLICE DEPARTMENT
` COMPUTER NETWORK
22,500
22,500
COMPUTER NETWORK
' LIVESCAN FINGERPRINT WORKSTATION
60,000
60,000
LIVESCAN FINGERPRINT WORKSTATION
` MOBILE DATA TERMINAL REPLACEMENT
.............................................................................
11,000
.............................................».».....................
27,500
11,000
5,500
...............................
5,500
«...........................................................................
60,500
MOBILE DATA TERMINAL REPLACEMENT
.........................,.....
' MOBILE COMMAND CENTER
30,000
MOBILE COMMAND CENTER
' ANIMAL CONTROL VEHICLE
..... ... ..... ...... .............. . ................................ ...........
..
............. . ..... ....
.30,000.
18,000
............... ..........
...................
......... ..........................
...,................
18,000
ANIMAL CONTROL VEHICLE
..... ............................. ..... ...... .... ......... ........... .,,,............
' AUTOMATIC VEHICLE LOCATOR SYSTEM
87,171
87,171
AUTOMATIC VEHICLE LOCATOR SYSTEM
' COMPUTER -AIDED DISPATCH
238,350
238,350
COMPUTER -AIDED DISPATCH
PUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT
' ALLEY PAVING- ASPHALT
109,000
113,360
117,894
122,610
127,514
590,378
ALLEY PAVING- ASPHALT
' EQUIPMENT REPLACEMENT
290,200
299,000
187,000
250,000
291,000
1,317,200
EQUIPMENT REPLACEMENT
' CORROSION CONTROL -IEPA MANDATE
38,850
38,850.
CORROSION CONTROL-EPA MANDATE
` FUEL STORAGE MONITORING SYSTEM
35,790
35,790
FUEL STORAGE MONITORING
' STORM WATER SEPARATION
96,000
96,000
96,000
96,000
96,000
480,000
STORM WATER SEPARATION
(�
... ........ . .... .............................. . ..............................
SEWER REHAB- INSITUFORM
.....................................
.... .........................................
188,900
174,100
.....................
167,800
... ...........
180,300
.......
711,100
... ............... ................................................ ...................
SEWER REHAB- INSITUFORM
f)
WASTE OIL STORAGE
............. . ............................ .. ............. ....................
.........................................
23,858
.....................
...................
.....................
.... ...........
23,858
,......
WASTE OIL STORAGE
................... ..................................................................
` PUMP REPLACEMENT -NORTH STATION
25,875
26,910
52,785
PUMP REPLACEMENT -NORTH STATION
037052 - 552290
037052 - 552290
037052- 552290
307051 - 552290
307054 - 552290
307073 - 552140
062036 - 572030
028024- 554110 _
307055 - 552290
062036 - 572030
_____ ----------------- _______- ___- ______________ ----------- ======== ------------ - ________ ____ ___--____________ _________________- ____- ______ -_ _____ - _________
TOTAL - CAPITAL IMPROVEMENTS $2,454,262 $3,655,917 $7,212,320 $5,471,226 $5,493,410 $24,275,060 TOTAL - CAPITAL IMPROVEMENTS CIPFY98.WK3
li
VILLAGE OF MORTON GROVE
- FY1998- FY2002 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY DEPARTMENT
ESTIMATED COST BY FISCAL YEAR
RANK PROJECT NAME 1997 -98 1998 -99 1999 -2000 2000 -2001
VILLAGE OF MORTON GROVE
FY1998- FY2002 CAPITAL IMPROVEMENT PROGRAM SUMMARY BY DEPARTMENT
TOTAL COST
2001-2002 _1997_2002______ ___ __________________PROJECT NAME _________ _______
OPERATING BUDGET
ACCOUNT PAGE
NUMBER NO
DEPARTMENT OF COMMUNITY DEVELOPMENT
«.» ... .,, .n
-
«m... .. . -..e,_
.-.,,___nr_
DEPARTMENT OF COMMUNITY DEVELOPMENT
___ -_. . _-
30,00Ci
BECKWITH RD /CHURCH ST ENGINEERING
46,500
14,250 36,000 20,300
117,050
BECKWITH RD /CHURCH ST ENGINEERING
307072 - 552140
0 CAD /GIS SYSTEM
25,422
25,799 20,301 20,301 20,301
112,124
267,225
CAD /GIS SYSTEM
HARMS ROAD RECONSTRUCTION
027022- 572010
HARMS ROAD RECONSTRUCTION
12,075
267,22 -5
"0,500
` LAKE STREET REHABILITATION
3466,500
-`-"� / I
34
LAKE STREET REHABILITATION
' LOCAL STREET CRACK SEALING
1,000
15,000 15.000 15,00E 15,000 1
75,000
LOCAL STREET MICROSEALING
037052 - 552290
` LOCAL STREET MICRO- SEALING
eJ 0\ 1
50,000
35-866-,.
50,000 50,000 50,000 50,000
35,000 35000 35000 - 35000 �...�
250,000
175000
LOCAL STREET MICRO- SEALING
LOCAL STREET MICRO- SEALING --
037052- 552290
037052- 552290
LOCAL STREET PATCHING. I
r
7876
6 "3"922,'500
a��79Y.500'l� 800 -,000 S� 802 -,506
X84
RESURFACING
307051 - 552290
l t 1
` MILLER'S MILL ROAD STORM SE R
- KrCd� - f
300
16, 000
/
258 500 K
350 `�8�585 03000 97.710
274,500
444,020
MILLER'S MILL ROAD STORM SEWER
NEIGHBORHOOD STREET LIGHTING
307054552290
NEIGHBORHOOD STREET LIGHTING J
" T C HNY TRAIL BIKE PATH
0,000
66 000- IIII�
72,000
TECriNS TRAIL BIKE PATH
307073 - 552140
' WATER MAIN IMPROVEMENTS
36 300
B75,050 ? 670 800 224.675 i
1,806,825
WATER MAIN IMPROVEMENTS
- ""
` CHURCH STREET - LINDER /AUSTIN
1 ;550000-
841,500 -I
841,500
CHURCH STREET LIND R /AUSTIN
-'" FLICKINGER CENTER REMODELING' -
' FERNALD AVENUE RECONSTRUCTION
' FLICKINGER CENTER ROOF REPLACEMENT
24,990 --- '+523,740. -- -7
048.730
FERNALD AVENUE RECONSTRUCTION -
' GGORGIANAJSMITHWOOD RECONSTRUCTION
106450.
- 401,500 --- -
401,500
- - GEORGIANA/SMITHWOOD RECONSTRUCTION
65,500
' GROSS POINT ROAD RECONSTRUCTION
41,685 11,844 525,000
578,529
GROSS POINT ROAD RECONSTRUCTION
" - PUBLIC WORKS PARKING LOT RESURFACING
' M NARD AVENUE REHABILITATION
` PUBLIC WORKS OFFICE REMODELING
405,000
405,000
MENARD AVENUE REHABILITATION
- ....., +«
.... «. , + +, «, + «.. +„ ,.. ««, + +,. «, + +, +. , .,.,«. , « «„
...... .,.
......... ++ .. «.« . , +. + +,+ + + + + +, + +. , + «« + +. ,.1
,. ..,... +.. «.
+ « «,. ., , .. +.«
BECKWITH ROAD- WASHINGTON /ORIOLE
- .228000-
228,000
BECKWITH ROAD- WASHINGTON /ORIOi Eis
FIRE STATION #5 EMERGENCY GENERATOR
' NORMANDY AVENUE RECONSTRUCTION. rnt II /t
'
,p.-
206,750
6 ?Z
20e 750
490 725
- NORMANDY AVENUE RECON_STR� CTION
LNG
WAUKF.�APv ROAD LIGHTING
W'AUKEGAN ROAD- UGHTING 1 Ai/1{ ='CN= ==1 HA�rm/i_!�M VPs3,r!;
. /#4..8.6 ,.�.. _
FIRE STATION #4 ROOF REPLACEMENT
_ ..
FIRE STATION #5 ROOF REPLACEMENT
' BECKWITH ROAD- AUSTIN /WAUKEGAN
/ 807,900 1
807,900
BECKWITH ROAD-MASON/lEHIGH
15,900
+ CAPULINA RELIEF SEWER
-
135,000 2,735.000
- .2.870,000
CAPULINA RELIEFSEWER
SCECHCOLCTREETRFCONSCTIv
577500
S7T,500
`GH00 STRFPTR RECONSTRUCTION -
-
' BECKWITH ROAD- WAUKEGAN / URIOLE
256,000
256,000
BECKWITH. ROAD- L_HIGH /ORIOLE
22,500
FINANCE DEPARTMENT
TEt. FPHONE SYSTEM UPGRADE:
FINANCE DEPARTMENT
TELEPHONE S`
.............. . «.. „ > «..., . «, «« .. + +,
' COPIER REPLACEMENT
«.» ... .,, .n
-
«m... .. . -..e,_
.-.,,___nr_
- --- ___- "- -___._
___ -_. . _-
30,00Ci
300001
.. COPIER REPLACEMENT- ... :.
-.
- FIRE
• DEPARTM' ENT
AMBU,_'1NCEREPLACEMENIT
t34,000
,34000
FIRE DEPARTMENT
AMBULANC ERE°LACEMEN'
_
@r
' ENGINE REPLACEMENT
J
_
297,000
297.000
- ENGINE R...... CEMENT
-: COMMAND VEHICLE REPLACEMENT -
44,500
44500"
COMMAND VEHICLE REPLACEMENT
-
HEALTH AND HUMAN SERVICES
HEALTH AND HUMAN SERVICES
' SENIORTRAN REPLACEMENT -'. -
- 54,000-
- ."
-
54,000'
". , '- SENIORTRAN REPLACEMENT`
MUNICIPAL BUILDINGS
MUNICIPAL BUILDINGS-
_
' FLICKINGER CENTER REMODELING -
- ""
150,000 "'
1 ;550000-
` "1550,009'-
3,275000 -'
-'" FLICKINGER CENTER REMODELING' -
-
' FLICKINGER CENTER ROOF REPLACEMENT
,��yyt�25000`
� %60 66.250.
39;700
106450.
FLICKINGER CENTER ROOF REPLACEMENT -
028024-554110,
PUBLIC WORKS PARKING LOT RESURFACING
65,500
236,525
?-
302,025
" - PUBLIC WORKS PARKING LOT RESURFACING
` PUBLIC WORKS OFFICE REMODELING
-1-., 1 1
-----------------------
150,000
PUBLIC WORKS OFFICE REMODELING
FIRE STATION #5 EMERGENCY GENERATOR
30,700
30,700
FIRE STATION #5 EMERGENCY GENERATOR
' FIRE STATION #4 ROOF REPLACEMENT
-
61,800
61,800
FIRE STATION #4 ROOF REPLACEMENT
_ ..
FIRE STATION #5 ROOF REPLACEMENT
15,900
15,900
FIRE STATION #5 ROOF REPLACEMENT
-
POLICE DEPARTMENT
POLICE DEPARTMENT
COMPUTER NETWORK
22,500
22,500
COMPUTER NETWORK
LIVESCAN FINGERPRINT WORKSTATION
60,000
60,000
LIVESCAN FINGERPRINT WORKSTATION
MOBILE DATA TERMINAL REPLACEMENT
11,000
27,500
11,000
5,500
5,500
60,500
MOBILE DATA TERMINAL REPLACEMENT
«. ..«.,.- +.... «. « «..,......, «. «.. ««. »« « « « «. ««,.. «..., + « «. «....... +.
...« «.. « « «..,++, «...... .... «.. ....
MOBILE COMMAND CENTER
+„ «. , «, « + « «.......,,
«,+..,««... «.
30,000
...+>. «.... »..««.,.+«
,... « «..,.,,_.«...+.
«.. .....««.«..
.....
30,000
MOBILE COMMAND CENTER
' ANIMAL CONTROL VEHICLE
18,000
-
18,000
ANIMAL CONTROL VEHICLE
' AUTOMATIC VEHICLE LOCATOR SYSTEM
87,171
87,171
AUTOMATIC VEHICLE LOCATOR SYSTEM
-
` COMPUTER -AIDED DISPATCH
238,350
..
238,350
COMPUTER -AIDED DISPATCH
PUBLIC' WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT
' ALLEY PAVING- ASPHALT
109,000
113,360
117,894
122,610
127,514
590,378
ALLEY PAVING - ASPHALT
307055- 552290
' EQUIPMENT REPLACEMENT
290,200
299,000
187,000
250,000
291,000
1,317,200
EQUIPMENT REPLACEMENT
062036 - 572030
CORROSION CONTROL -IEPA MANDATE
38,850
38,850
CORROSION CONTROL -IEPA MANDATE
' FUEL STORAGE MONITORING SYSTEM
35,790.
35,790
FUEL STORAGE MONITORING
-
'... STORM WATER SEPARATION
96.000
96,000.
. 96,000.
96,000.
96,000
480,000
STORM WATER SEPARATION
WASTE OIL STORAGE
23858
23858
WASTE OIL. STORAGE
«,,.. «. .. « +.. ..... .... «...,, «.+
,... «. ................
SEWER REHAB INSITUFORM
. «, «..
.,.«..,,. ....., ».
188900
.« «..,..,.......
««..........,.......
174100
... «,.,.,,,......
«..
167,800
+..
i 180300
. «
711100
„ "..... ....
««,.
SEWER REHAB INSITUFORM *_
. +., . ............... ,.., ...
' PUMP REPLACEMENT -NORTH STATION
25,875
2 6,910
52,785.
PUMP REPLACEMENT -NORTH STATION
$2,571,870
_____
TOTAL - CAPITAL IMPROVEMENTS
CIPFY98_WK3 _
$5,781,534
$5,748,060
$5,537.411
$4,7 "08.735
$24,395,535
70TAL- CAPITAL IMPROVEMENTS
•
4 Village of Morton Grove
Department of Community Development
Direct Telephone 708/470-5231
MEMORANDUM
To: D. Scanlon, Village President
D. Sneider, Village Trustee
R. Brenner, Village Trustee
/L. Arft, Village Administrator
From: Charles S. Scheck, Director, Co 9inity Developu rent/ � i1
Date: December 2, 1996 / '
Re: Capital Improvement Program Project Review Meeting-December 18, 1996
I have attached Capital Improvement Program project descriptions submitted by each of the
Departments listed below.
ti. The ad-hoc Capital Improvement Program Committee project review meeting is scheduled
for Wednesday, December 18, 1996 beginning at 2:30 p.m. in the Trustees Conference
Room. Representatives from each department submitting projects have been asked to discuss
their department's projects with the Committee:
2:30 - 2:50 Public Works Department
2:50 - 3:10 Building Department
3:10 - 3:30 Fire Department
3:30 - 3:50 Police Department
3:50 - 4:00 Finance Department/Health
& Human Services Department
4:00 - 4:30 Community Development Department
It is anticipated that this meeting will provide an initial assessment of the highest priority
projects to be included in the operating budget for Fiscal Year 1998.
If you have any questions regarding this meeting, please contact me immediately.
CSS:dn
Richard T. Flickinger Municipal Center
6101 Capulina Avenue • Morton Grove, Illinois 60053-2985
Tel: (708) 965-4100 • TDD (708) 470-5249 • Fax: (708) 965-4162
RewcleJ Pup,
Village of Morton Grove — Capital Improvement Program
PROJECT DESCRIPTION
te:
11/20/96
Department:
Community Development
Fy
2000
FY
2001
Project
Name:
Beckwith Road /Church
Street Engineering
Type of Project:
Planning or Design a Equipment Purchase
Site Acquisition Facility Construction
Description of Project /Services to be Provided:
Beckwith Road /Church Street is the only local street which runs the length of
the Village -- approximately 3.2 miles. Pavement conditions vary from good to
very bad. Phase I engineering will be completed and accepted by IDOT by
April 30, 1997, allowing the consulting engineers to proceed with the Phase
II Design Engineering for the first segment of this roadway.
Included in the Phase I engineering report is the assessment of Beckwith Road
Bridge repairs. This will allow the Village to complete the necessary
maintenance activities as a part of the roadway work, taking advantage of
federal matching funds.
)e implementation schedule for Phase II engineering is indicated below, with
the schedule of construction for each of the four (4) segments along
Church /Beckwith indicated on the specific project description form.
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching and drainage
structure repairs).
• Improved riding surface for residents.
• Improved drainage characteristics.
• Increase safety to vehicles and pedestrians using the roadway.
Evaluation Criteria Met:
• Deteriorated Facility - Rehabilitation of deteriorated streets.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Risk to Public Safety or Health - Elimination of hazards to driving
public, pedestrians, and bicyclists.
• Coordination — Installation of water main along Beckwith Road to be
undertaken in conjunction with roadway improvements.
Implementation Schedule:
Phase I Preliminary Engineering - FY 1996/FY 1997
(, lase II Design Engineering
Church /Beckwith, Austin to Linder - FY 1998
Beckwith, Washington to Oriole FY 1999
Beckwith, Waukegan to Austin - FY 2000
Beckwith, Oriole to Waukegan - FY 2001
CAP- IMPR \97CSS
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/20/96 Department: _ Community Development
Project Name: Beckwith Road /Church Street Engineering
- Construction Cost
Cost Elements
Cost to
Date
FY
1998
FY
1999 ,'
Fy
2000
FY
2001
FY
2002
FY 1998 -
FY 2002
Total
Planning/
Design
"$178,70'5
$96,900
$47,500
$120, 000
$67,700,
$332,100
Site
Acquisition
Equipment
Construction
disc.
Total
$178,755
$96,900
$47,500 ,
$120,000
$57,700
$332, 10C
Village of
Morton Grove
$178,756
$45,500
$14,250,
$ 36,000
$20,300
$117,050
Construction Cost Basis of estimate:
Bids Received Ei
Comparable Facility Cost F
Date of Estimate:
Cost estimates subsequent to FY 1998
per year to account for inflation.
Financing Other Than Property Tax:
Intermodal Surface Transportation Act
- Phase II Engineering only.
Motor Fuel Tax
Impact on operating Costs:
gineer, Architect, X
or Vendor Estimate
andard Cost -
Chicago Area
ve been increased by five (5) percent
(70% matching funds,
30% local funds)
Reduction in staff time and material cost for maintenance by
Public Works crews.
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: 11/11/96 Department; Community Development
ecoject Name: CAD /GIS System
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project /Services to be Provided:
Computer Assisted Drafting (CAD) and Geographic Information System (GIS) provides a
system for the storage of data relational to a physical location in the Village, and
allows for easy referral or use of the data in reviewing proposals or developing plans
and projects. FY 1998 continues the planned deployment of Query Station computers in
the various Village departments by adding Health & Human Services and the Finance
Department to the system. An additional computer is requested to replace the Engineer
Assistant's computer, upgrading it to the Windows NT operating system. Experience has
shown this to be a much more stable platform for CAD /GIS operations. The Engineer
Assistant's current computer will be retained for use by a GIS intern during the summer
months, and by the Director of Community Development the remainder of the year.
The purchase of a CD Writer will allow the department to disseminate information to the
GIS computers in other departments. A significant decrease in the price of this
equipment item has made purchase of the equipment more economical than having the CD's
-epared by a third party as originally planned.
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Provides Village Departments with access to graphics and supportive information
within the GIS system.
• Allows individual departments to develop personalized databases for specialized
applications.
• Increases the scope and depth of the supporting information available on the
system.
Evaluation Criteria Met
• Coordination - Current data on utilities will better ensure that a proposed
project will not conflict with one recently completed or to be
undertaken.
• Improvement of operating efficiency - System access by various departments will
ensure sharing of the data and ready access of information will
minimize search time.
ementation Schedule:
System
components
to be
installed as indicated below:
Fiscal
Year
1994 -1995
FY 1998 -
Community Development /Engineering
Fiscal
Year
1995 -1996
2000
Unix Server upgrade
2002
FY 2002
Public Works /Building Dept. /Fire Dept.
Fiscal
Year
1996 -1997
1996
Police Dept.
Fiscal
Year
1997-1998
Health and Human Services /Finance Dept. /Engineer
/ `i
Design
Assistant's Computer
�scal.Year
1998 -1999
Director of Community Development's Office /software
Site
for Village Administrator's office.
Fiscal
Year
1999 -2000
Upgrade Hardware - Fire Dept. and Building. Dept.
Fiscal
Year
2000 -2001
Upgrade Hardware - Public Works and Police Dept.
Fiscal
Year
2001 -2002
$69,388
Upgrade Hardware - Village Administrator's
$ 9,600
$ 6,400
$ 6,400
$ 6,400
Office /Health and Human Services
C \ .. \CAP-1MPR\
99MTF
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/11/96 Department: _ Community Development
Project Name: CAD /GIS System
Construction Cost -
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Elements
Date
1998
1999
2000
2001
2002
FY 2002
Chicago Area
Date of Estimate:
November
1996
Total
Planning/
not been
increased to account for inflation.
Design
Site
Acquisition
Equipment
$69,388
$10,800
$ 9,600
$ 6,400
$ 6,400
$ 6,400
$ 39,500
Construe -
tion /Repair
Misc.-
29,830
14,622
16,199
13,901
13,901
13,901
72,524
Wiring,
ogramming
fpport
LSotware
tal
=$99,218
$25,422
$25,799
$20,301
$20,301
$20,301
$112,124
Basis of Construction Cost Estimate:
Financing Other Than Property Tax:
Impact on Operating Costs:
Operating costs are anticipated to be $1,200 per year
media, ink, and CD -ROM disks.
This will include all
Bids Received
Engineer, Architect,
or Vendor Estimate
Comparable Facility
Cost
Standard Cost -
Chicago Area
Date of Estimate:
November
1996
Estimated costs have
not been
increased to account for inflation.
Financing Other Than Property Tax:
Impact on Operating Costs:
Operating costs are anticipated to be $1,200 per year
media, ink, and CD -ROM disks.
This will include all
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
`'Date: 10/16/96 Department: Community Development
Project Name: Harms Road Reconstruction - Lake Street to Greenwood Avenue
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction X
or Repair
Description of Project/Services to be Provided:
Reconstruct Harms Road, Lake Street to Greenwood Avenue - the existing
bituminous surface is to be removed, the street section is to be lowered with
new storm sewers and structures to be installed. New curb and gutter, and
sidewalk are to be constructed the entire length. The new street section is
to be 3" bituminous mixture 8" aggregate base.
Anticipated Benefits (Increase in Service; Reduction in Cost) :
• Provide a uniform paved surface for improved traffic flow
• Improved drainage characteristics
• Reduction in maintenance costs
Evaluation Criteria Met:
• Deteriorated Facility - In 1994 the Department of Public Works paved
Harms to provide temporary relief. This Road must still be
reconstructed with storm sewers, curb & gutters & sidewalks
installed to provide a permanent solution to the problems
experienced on this block.
• Risk to Public Safety or Health - The existing street is susceptible to
pot holes & flooding which may cause vehicle or pedestrian
accidents.
• Improvement of Operating Efficiency - Reconstruction will reduce Public
Works' maintenance costs.
• Increase Property Values - Enhancement of the appearance of all
properties adjacent to the new street.
Implementation Schedule:
Bid Documents Available - April 1998
Initiate Construction - May 1999
Complete Construction - December 1999
CAP-IMRP\97CDC 12/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/16/96 Department: Community Development
Project Name: Harms Road Reconstruction - Lake Street to Greenwood Avenue
- Construction Cost -
Cost Cost to FY FY FY FY FY FY 1998 -
Elements Date 1998 1999 2, 000 2001 2002 FY 2002
Total
Planning/ $12, 075 $ 12, 075
Design
Site
Acquisition
Equipment
Construc- $252, 000 252, 000
tion/Repair
Misc. Con- 15, 225 15, 225
struction
Inspection
& Soil &
Mat' 1
Testing
Total $12, 075 $267,225 $279, 300
Basis of Construction Cost Estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost X Standard Cost -
— Chicago Area
Date of Estimate: October 1996
Financing Other Than Property Tax:
• Special Service Area Designation
• Motor Fuel Tax (MFT)
Impact on Operating Costs:
CAP-IMPR\97CDC
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
CDate: 10/16/96 Department: Community Development
Project Name: Harms Road Reconstruction - Lake - Street to Greenwood Avenue
Type of Project:
Cost to
FY
FY
Planning or Design
a
Equipment Purchase
FY 1998 -
Site Acquisition
Date
Facility Construction
or Repair
�X
Description of Project /Services to be Provided:
Reconstruct Harms Road, Lake Street to Greenwood Avenue - the existing
bituminous surface is to be removed, the street section is to be lowered with
new storm sewers and structures to be installed. New curb and gutter, and
sidewalk are to be constructed the entire length. The new street section is
to be 3" bituminous mixture 8" aggregate base.
Anticipated Benefits (Increase in Service;
Cost):
• Provide a uniform paved surface for improved traffic flow
• Improved drainage characteristics
• Reduction in maintenance costs
Evaluation Criteria Met:
• Deteriorated Facility - In 1994 the Department of Public Works paved
Harms to provide temporary relief. This Road must still be
reconstructed with storm sewers, curb & gutters & sidewalks
installed to provide a permanent solution to the problems
experienced on this block.
• Risk to Public Safety or Health - The existing street is susceptible to
pot holes & flooding which may cause vehicle or pedestrian
accidents.
• Improvement of Operating Efficiency - Reconstruction will reduce Public
Works' maintenance costs.
• Increase Property Values - Enhancement of the appearance of all
properties adjacent to the new street.
Implementation Schedule:
Bid Documents Available
Sign Contract
Initiate Construction
Complete Construction
CAP- IMRP \97CDC
- February 1998
- March 1998
- May 1998
- September 1998
10/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/16/96 Department: Community Development
Project Name: Harms Road Reconstruction - Lake Street to Greenwood Avenue
- Construction Cost -
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Elements
Date
1998
1999
2,000
2001
2002 .
FY 2002
Total
Planning/
$12,075
$ 12,075
Design
Site
Acquisition
Equipment
Construc-
$252,000
252,000
tion /Repair
Misc. Con-
15;225
15,225
struction
Inspection
& soil &
Mat'1
Testing
Total
$12,075
$267,225
$279,300
Basis of Construction Cost Estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost X Standard Cost -
Chicago Area
Date of Estimate: October 1996
Financing Other Than Property Tax:
• Special Service Area Designation
• Motor Fuel Tax (MFT)
Impact on Operating Costs:
.CAP- IMPR \97CDC
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Ute: 10/21196 Department: CommunitV Development
Project Name: Lake Street Rehabilitation - Mason Avenue to Central Avenue
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction �X
or Repair
Description of Project /Services to be Provided:
4
Repair and patching of Lake Street from Mason Avenue to Central Avenue. This
street is a concrete street which has been deteriorating over the past
several years. The intersections have many spots which are hollow under the
existing pavement section. All concrete intersections are to be removed and
replaced with bituminous mixture and structures are to be repaired or
replaced. Various cracked and broken sections of the street are to be
removed and replaced with a bituminous mixture. Both sides of the street are
to be cold milled 6' wide. The entire length of the project is to be
surfaced with 3" of bituminous mixture..
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/21/96 Department: Community Development
Project Name: Lake Street Rehabilitation - Mason Avenue to Central Avenue
- Construction Cost -
-iticipated Benefits (Increase in Service; Reduction in Cost):
Cost to
Fy
FY
FY
--F
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
.2001
2002
FY 2002
Comparable Facility
Cost
Standard Cost -
Chicago Area
Total
Planning/
October 1996
Evaluation Criteria Met:
• Deteriorated Facility - All intersections are in advanced stages of
Design
deterioration, including all drainage structures and manholes
Financing Other Than
Property Tax:
at these intersections; street cracking is becoming more
Site
severe.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
Acquisition
• Risk to Public Safety or Health - Elimination of hazards to driving
public and pedestrians alike.
Equipment
• Protection of Investment - Roadway is spalling; surface must be
protected or street will require complete replacement.
Construe-
$343,350
Impact on Operating
Costs:
$343,350
tion /Repair
-
Misc. Soil &
3,150
3,150
Material
Testing
Total
$346,500
$34',500
-iticipated Benefits (Increase in Service; Reduction in Cost):
Construction Cost Basis of estimate:
-
>
® Reduction in maintenance required by public works (patching, crack
Bids Received
Engineer, Architect,
sealing, and structure repair).
or Vendor Estimate
+ Improved riding surface for residents.
+ Improved drainage characteristics.
Comparable Facility
Cost
Standard Cost -
Chicago Area
Date of Estimate:
October 1996
Evaluation Criteria Met:
• Deteriorated Facility - All intersections are in advanced stages of
deterioration, including all drainage structures and manholes
Financing Other Than
Property Tax:
at these intersections; street cracking is becoming more
severe.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Risk to Public Safety or Health - Elimination of hazards to driving
public and pedestrians alike.
• Protection of Investment - Roadway is spalling; surface must be
protected or street will require complete replacement.
Impact on Operating
Costs:
Implementation Schedule:
,,.,.Bid Documents Available - February 1997
�Jign Contract - March 1997
Initiate Construction - May 1997
Complete Construction - September 1997
CAP- TMPR\97CDC
11
E
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
C;?te: 10/21/96 Department: Community Development
Project Name: Local Street Crack Sealing
Type of Project:
Planning or Design � Equipment Purchase
Site Acquisition a Facility Construction �X
or Repair
Description of Project /Services to be Provided:
I
Crack sealing of various streets, approximately 12,000 lineal feet - this
process injects a rubberized material into cracks in the bituminous surface
to prevent water infiltration into the pavement base. This process will be
used in advance of the micro - surfacing project with the unused quantity to be
installed on other streets that would require crack sealing.
U
Anticipated Benefits (Increase
Service; Reduction in Cost):
• Reduction in maintenance required by Public Works.
• Protect the streets from extensive base failures due to water
penetrating the street.
• Improved drainage characteristics.
Evaluation Criteria Met:
• Deteriorated Facility - Street cracking is allowing water into base
which may cause pavement failures in the future.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Protection of Investment - Road surfaces are cracking due to age and
weather conditions; cracks must be sealed to protect the
street from base failures which would then require extensive
patching or even street reconstruction.
Implementation Schedule:
Bid Documents Available - February 1997
`?ign Contract - March 1997
Jiitiate Contract - April 1997
Complete Construction - May 1997
CA2- IMPRV97CM7
10/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/21/96 Department: Community Development
Project Name: Local Street Crack Sealing
- Construction Cost -
Construction Cost Basis of Estimate:
Bids Received Engineer, Architect, LJ
F or Vendor Estimate LJ
Comparable Facility Cost XI Standard Cost -
1 Chicago Area
Date of Estimate: October 1996
Financing Other Than Property Tax:
Impact on Operating Costs:
CA2- IMPR \97CDC
via
10/96
Cost to
FY
FY
FY
FY
1F17
FY 1998 -
Cost Elements
Date
1998
1999 !
2000
2001
2002
FY 2002
Total
Planning/
Design
Siee
Acauisltlon
Equipment
Construction
$15,000
$15,000
$15,000
$15,000
$1 =,000.
$75,000
/Repair
Misc.
Total
$15,000
$15,000
$15,000
$15,000
$7.5,000
$75,000
Construction Cost Basis of Estimate:
Bids Received Engineer, Architect, LJ
F or Vendor Estimate LJ
Comparable Facility Cost XI Standard Cost -
1 Chicago Area
Date of Estimate: October 1996
Financing Other Than Property Tax:
Impact on Operating Costs:
CA2- IMPR \97CDC
via
10/96
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
_ate: 10/16196 Department: Community Development
Project Name: Local Street Micro - sealing
Type of Project:
Planning or Design Equipment Purchase u
Site Acquisition Facility Construction
�I
or Repair �
Description of Project /Services to be Provided:
Micro - sealing of various streets, approximately 1.0 mile - micro - sealing is a
latex modified emulsified (liquid) asphalt, with crushed aggregate. The
mixture is a liquid that is installed in one lift (layer) to obtain the 3 /8"
thickness required. After application of micro - sealing the street may be
opened to traffic within approximately four (4) hours.
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/16/96 Department: Community Development
Project Name: Local Street Micro- sealing
- Construction Cost -
Construction Cost Basis of Estimate:
Anticipated Benefits (Increa se in Service; Reduction in Cost): Engineer, Architect,
Bids Received or Vendor Estimate
• Reduction in maintenance required by Public Works.
• Improved vehicular traction (for vehicle control).
• Extend the life of existing bituminous pavements. Comparable Facility Cost �X Standard Cost -
• Seals cracks to prevent early pavement failures. Chicago Area
• No structure adjustments required.
Date of Estimate: October 1996
i
I
Evaluation Criteria Met: (i
� Financing Other Than Property Tax: lu
• Deteriorated Facility - Sealing of oxidized, worn and cracked bituminous (� /
surfaces. /
• Improvement of operating Efficiency - Reduction of maintenance costs.
• Protection and conservation of existing investment - Seals cracks and
extends the useful life of oxidized bituminous pavement.
Implementation Schedule: Impact on operating Costs:
Bid Documents Available - June 1997
F( )Sign Contract - July 1997
Initiate Contract - August 1997
Complete Construction - October 1997
CAP -IM.PR \97CDC 10/96 10/96
CA ?-IMPR \97CDC
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
Construction
$47,200
$50,000
$50,000
$50,000
$50,000
$50,000
$250, 000
/Repair
Misc.
Total
$50,000
$50, 0o0
$50,000
$50,000
$50,000
$250,000'...
Construction Cost Basis of Estimate:
Anticipated Benefits (Increa se in Service; Reduction in Cost): Engineer, Architect,
Bids Received or Vendor Estimate
• Reduction in maintenance required by Public Works.
• Improved vehicular traction (for vehicle control).
• Extend the life of existing bituminous pavements. Comparable Facility Cost �X Standard Cost -
• Seals cracks to prevent early pavement failures. Chicago Area
• No structure adjustments required.
Date of Estimate: October 1996
i
I
Evaluation Criteria Met: (i
� Financing Other Than Property Tax: lu
• Deteriorated Facility - Sealing of oxidized, worn and cracked bituminous (� /
surfaces. /
• Improvement of operating Efficiency - Reduction of maintenance costs.
• Protection and conservation of existing investment - Seals cracks and
extends the useful life of oxidized bituminous pavement.
Implementation Schedule: Impact on operating Costs:
Bid Documents Available - June 1997
F( )Sign Contract - July 1997
Initiate Contract - August 1997
Complete Construction - October 1997
CAP -IM.PR \97CDC 10/96 10/96
CA ?-IMPR \97CDC
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
te: 10/21/96 Department: Community Development
Project Name: Local Street Bituminous Patching
Type of Project:
Planning or Design Equipment Purchase nX
Site Acquisition Facility Construction
or Repair
Description of Project /Services to be Provided:
Bituminous patching of various streets,, approximately 700 square yards - this
process is the removal of the existing bituminous pavement in failure areas,
recompaction of the existing aggregate base and the installation of a 3" to
5" bituminous mixture. This process is used in advance of the micro -
surfacing process, with any unused quantity to be used on other streets that
require bituminous patching.
j:ticipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance reauired by Public works.
• Remove minor pavement failures before the failures become more
extensive.
• Improved riding surface for residents.
• Improved drainage characteristics.
Evaluation Criteria Met:
• Deteriorated Facility - Street cracking promotes base failures.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Risk to Public Safety or Health - Elimination of hazards to driving
public, pedestrians, and cyclists alike.
• Protection of Investment - Roadway is failing in isolated areas; the
surface must be patched to protect the street.
Implementation Schedule:
Bid Documents Available - February 1997
Sign Contract - March 1997
}iitiate Contract - April 1997
omplete Construction - June 1997
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/21/96 Department: Community Development
Project Name: Local Street Bituminous Patching
Construction Cost -
Construction Cost Basis of Estimate:
n Engineer, Architect,
Bids Received -or Vendor Estimate
n
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: October 1996
Financina Other Than Propertv Tax:
Impact on Operating Costs:
E
E
10(36
CAP- IMPR \99 CDC 10/96 CAP- 1MPR \97CDC
Cost to
?Y
'c'Y
^`!
EY
EY
ey 1398 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2CO2
Total_
Planning/
Design
Site
Acquisition
Eauinment
-,
Construction
$57,200
$50,000
$50,000
$50;000
$50,000
$S0., .coo
$250,000
/Repair
Misc.
Total
$00,000
$50,000
$50,000
$50,000
$50,000
$250,000
Construction Cost Basis of Estimate:
n Engineer, Architect,
Bids Received -or Vendor Estimate
n
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: October 1996
Financina Other Than Propertv Tax:
Impact on Operating Costs:
E
E
10(36
CAP- IMPR \99 CDC 10/96 CAP- 1MPR \97CDC
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
'ate: October 16, 1996 Department: Community Development
Project Name: Local Street Resurfacing Program
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction XI
or Repair
Description of Project/Services to be Provided:
Repair, recycling, and resurfacing of local streets which are in various
stages of deterioration. Streets which are included in the Fiscal Year 1997-
1998 Program are:
Base Bid Streets - Ozanam between Beckwith Rd. and Palma Lane; Foster
St. between Palma Lane and Harlem Ave. ; Simpson St. between Sayre Ave. and
West End; Osceola Ave. between Arcadia Ave. and Beckwith Rd. ; Cleveland Ave.
between Marmora Ave. and Major Ave. Total cost of Base Bid Streets -
$375, 000. 00
Alternate Bid Streets - South Park Ave. between Austin Ave. and East to
concrete street; Greenwood Avenue between Harlem Ave. and Oswego Ave. ; New
England Ave. between Dempster St. to Churchill Ave. ; Odell Ave. between
Greenwood Ave. to Suffield Ct. Total cost of Alternate Bid Streets -
$310, 000. 00.
Base Bid Streets - $375, 000. 00
Alternate Bid Streets - 310, 000. 00
Total - $685, 000. 00
Anticipated Benefits (Increase in Service; Reduction in Cost) :
• Reduction in maintenance required by Public Works (patching) .
• Improved riding surface for residents.
• Improved drainage characteristics.
Evaluation Criteria Met:
• Deteriorated Facility--Reconstruction of most deteriorated streets
• Improvement of Operating Efficiency--Reduction of maintenance costs
• Risk to Public Safety or Health--Elimination of hazards to driving
public and pedestrians alike.
• Protection of Investment —Surfacing provides protection to base.
Implementation Schedule:
Bid Documents Available - February 1997
Sign Contract - March 1997
Initiate Construction - May 1997
Complete Construction - September 1997
C\..ACAP-.`MPRV97CDC 12/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: October 16, 1996 Department: Community Development
Project Name: Local Street Resurfacing Program
- Construction Cost -
Cost Cost to FY FY FY FY FY FY 1998 -
Elements Date 1998 1999 2000 2001 2002 FY 2002
Total
Planning/ $ 21, 800
Design
Site
Acquisi-
tion
Equipment
Construc- 3, 011, 241 $685, 000 $280, 000 $465, 000 . $510, 000 $535, 000 $2,475, 000
tion/
Repair
Misc. -Soil 122, 000 42, 500 20, 000 35,000 40, 000 40, 000 177, 500
& Mat'l
Testing
Total $3, 155, 041 $727, 500 $300, 000 $500, 000 $550,000 $575, 000 $2, 652, 000
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
I— or Vendor Estimate
Comparable Facility Cost IX Standard Cost -
lll Chicago Area
Date of Estimate: October 1996
Estimated construction costs have not been increased to account for
inflation; soil and material testing costs have been increased approximately
five (5) percent per year.
Financing Other Than Property Tax:
Motor Fuel Tax (MFT)
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
ite: October 16, 1996 Department: Community Development
Project Name: Local Street Resurfacing Program
Description of Project/Services to be Provided:
Repair, recycling, and resurfacing of local streets which are in various
stages of deterioration. Streets which are included in the Fiscal Year 199°7-
1995 Program are:
Base Bid Streets - Ozanam between Beckwith Rd. and Palma Vane; Foster
St® between Palma bane and Harlem Ave.; Simpson St® between Sayre Ave. and
West End; Osceola Ave. between. Arcadia Ave. and Beckwith Rd.; Cleveland. Ave.
between Marmora Ave. and Major Ave. Total cost of Base Bid Streets -
375,000.00
Alternate Bid Streets - South Park Ave. between Austin Ave. and East to
increte street; Greenwood Avenue between Harlem Ave. and Oswego Ave.; New
England Ave. between Dempster St. to Churchill Ave.; Odell Ave. between
Greenwood Ave. to Suffield Ct. Total cost of Alternate Bid Streets -
$310,000.00.
Base Bid Streets - $375,000,00
Alternate Bid Streets - 310000 ®00
Total - $685,000 ®00
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching).
• Improved riding surface for residents.
• Improved drainage characteristics.
C: \.. \CAP- IMPR \97CDC
... February . .
- March 1997
- May 1997
September
Village of Morton Grove - Capital Improvement Program
Development
Project N• ' : Local Street Progra
- Construction Cost -
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
21,800
Design
Site
Acquisi-
tion
Equipment
Constru.c-
3,011,241
$685,000
$750,000
$750,000
$750,000
$750,000
$3,685,000
tion/
Repair
Misc. -Soil
122,000
42,500
45,000
47,500
50,000
52,500
237,500
& Mat'l
Testing
Total
$3,155,041
$727,500
$795,000
$797,500
$800,000
$802,500
$3,922,500
Cowstruction Cost Basis
Date Estimate: • • • - r .
Estimated construction costs have not been increased to account for
inflation; soil and material testing costs have been increased approximately
five (5) percent per year®
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
te: 11/6/96 Department: Community Development
Project Name: Miller's Mill Road Storm Sewer
Description of _ _ be Provided:
Avenue Construction of approximately 1650 lineal feet of storm sewer line on Lincoln
• • Lehigh Avenue, from Dempster to Elm Street.
.nticipated Benefits (Increase in Service; Reduction in Cost):
• Provide for improved storm water drainage in the area®
• Separate the storm drainage water from the combined sewer system®
Wesign/Bidding Documents - Fiscal Year 199
•* •_ Year s•s
C: \.. \CAP- ZMPR \97CSS
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/6196 Department: Community Development
Project Name: Miller's Mill Road Storm Sewer
Construction •
Date of Estimate: 10/94
Engineer, Architect,
or Vendor Estimate EX
Standard Cost
Chicago Area
Cost estimates have been increased by five (5) percent per year since the
ate of the initial estimate (1994).
Financinq Other Than--2K2 rt Tax:
Morton House Escrow Account - $40,000
Elm Street Apartments Escrow - 7f857
Motor Fuel Tax
p
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
2998
1999
2000
2001
2002
FY 2002
Total
Planning/
$2,500
$16, 000
$ 16,000
Design
Site
Acquisition
Equipment
Construction
$255,000
255,000
Misc.- soil &
3,500
3,500
Material
Testing
Total
$2,500
$16,000
$258,500
$274,500
Date of Estimate: 10/94
Engineer, Architect,
or Vendor Estimate EX
Standard Cost
Chicago Area
Cost estimates have been increased by five (5) percent per year since the
ate of the initial estimate (1994).
Financinq Other Than--2K2 rt Tax:
Morton House Escrow Account - $40,000
Elm Street Apartments Escrow - 7f857
Motor Fuel Tax
p
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
-jate., 11/22196 Department: Community Development
Project Name: Neighborhood Street Lighting .
Description of Project/Services to be Provided:
The street lighting program is continuing on an annual basis. Projects are
undertaken on a first-come, first-serve basis by petition® There is a
possibility that as we complete each years street lighting program that
sufficient interest will be created to generate new petitions for street
lights in surrounding areas® This has been the case in the past several
years®
Implementation Schedule E
Bid Documents Available - June 1997
Execute Contract - July 1997
Complete Construction - Oct 1997
Village of Morton Grove - Capital Improvement Program
Date: 11/22Z96 Department: Community Development
Project Name: Neighborhood Street Lighting
- Construction Cost I
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998
Elements
Date
1996
1999
2000
2001
2002
FY 2002
Total
Planning/
$ 5,768
$ 1,575
$ 1,650
$ 1,750
$ 11850
$ 1,950
$ 8,775
Design____
Site
Acquisition
Equipment
Construc-
321, 858
78,750
82,700
86,835
91,200
95,760
435,245
Lion /Repair
Plan Check-
ing & Misc.
Electrical
Inspection
Total
$327,626
$80,325
$84,350
$88,585
$93,050
$97,710
$444,020
Cost estimates have been increased five (5) percent per year subsequent to FY
199$®
Motor Fuel Tax
Contractorfs Construction - New Subdivision
Encrease in energy charges • $1,500 per year.
rAP-TMPR\q7rDC 10/96 CAP-IMPR\97CDC
10/96
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
.te: 11/11/96 Department: Community Development
Project Name: Techny Trail Bike Path
Description of Project/Services • be Provided:
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Access to Beckwith Road bicycle path from Dempster Street.
• Access to commuter stations, industrial areas, and commercial districts
of each community.
• Federal matching funds available - 30% for engineering and construction
costs®
C:\..\CAP-!MPR\97CSS
Village of Morton Grove - Capital Improvement Program
Date: 11111/96 Department:
Project Name: Techny Trail Bike Path.
- Construction Cost -
Construction Cost Basis
of estimate:
Bids Received Engineer, Architect, ixi
0 or Vendor Estimate _ f
Facility Cost Standard Cost
Chicago Area
Note: Cost estimates have been inflated five (5) percent per year from the
date of the original estimate.
ISTEA Funding - (80% Federal funds; 20% local funds)
Surface Transportation Program (STP)
- Congestion Mitigation and Air Quality (CMAQ)
Cost to
FY
FY
FY
FY
F
F 1998
Cost ---iement s
Date
1998
1999
2000
2007
2002
FY 2002
Total
Planning/
$127,933
$30,000
30,0001
DeS4 Lgn
SiteL
Acquisition
Equ4cment
Construction
5300,000
300,000
MI-sc.
0,000
3 0 , 0 C 0
$127,933
$30,000
IS330,000
S360,000
Village of
$ 8,533
$ 5,000
S 56,000
$ 72,000
Morton Grove
Construction Cost Basis
of estimate:
Bids Received Engineer, Architect, ixi
0 or Vendor Estimate _ f
Facility Cost Standard Cost
Chicago Area
Note: Cost estimates have been inflated five (5) percent per year from the
date of the original estimate.
ISTEA Funding - (80% Federal funds; 20% local funds)
Surface Transportation Program (STP)
- Congestion Mitigation and Air Quality (CMAQ)
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
)ate: 11/20/96 Department: Community Development
Project Name:- Water Main Improvements
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project/Services to be Provided:
Water system improvements recommended by the Village's
engineering
consultant
included the construction of new water main improvements.
The water main
improvements proposed include the following:
Estimated Construction
Size Location
Costs
Date
1211 Beckwith Road, Washington to Oriole
$231,000
1999
121, Ozark Avenue, Beckwith to Church
153,000
1999
1211 Waukegan Road, Beckwith to Dempster
624,000
2000
1211 Central Avenue, Main Street to 650 feet north of
112,000
2001
Lincoln Avenue
.211 Lake Street, Parkview School to McVicker
318,000
2001
1211 Menard Avenue/Alley North of Dempster/Marmora
209,000
2002
Avenue; connecting to Dempster
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Improved fire flow to all areas in the Village.
• Minimize the overtime required for Water Department personnel
conducting
repairs to the existing system.
Implementation Schedule:
Water Main Design
Water System Construction
- Fiscal Year 1998
- Fiscal Years 1999 - 2002
C:\..\CAP-IMPR\97CDC 12/96
Village of Morton Grove - Capital Improvement Program
Date: _ 11120296 Department: Community Development
Project Name: Water Main Improvements
- Construction Cost -
Construction Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$95,000
$36,300
$ 36,300
Design
Site
Acquisition
Equipment
Construction
$384,000
$624,000
$430,000
$209,000
1,647,000
Misc.-
Construction
Inspection
28,800
46,800
32,250
15,675
123,525
Total
$95,000
$36,300
$412,800
$670,800
$462,250
$224,675
$1,806,825
Construction Cost
Basis of estimate:
Bids Received
11
Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost Standard Cost
Chicago Area
Date of Estimate: 10/6196
Cost estimates subsequent to FY 1998 have been increased by five (5) percent
per year to account for inflation®
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
1-1�te: 11/20/96 Department: Community Development
Cost to
7Y
Project Name: Water Main Improvements
FY
FY
FY
FY 1998 -
Cost Elements
Type of Project:
1998
1999
Planning or Design Equipment Purchase
2001
2002
Site Acquisition Facility Construction
or Repair
Description of Project/Services to be Provided:
Total
Water system improvements recommended by the Village's
engineering
consultant
included the construction of new water main improvements.
The water main
improvements proposed include the following:
$ 36,300
Design
Estimated Construction
Size Location
Costs
Date
1211 Central Avenue, Main Street to 650 feet north of
$112,000
1999
Lincoln Avenue
1211 Lake Street, Parkview School to McVicker
318,000
1999
124, Beckwith Road, Washington to Oriole
231,000
1999
1211 Ozark Avenue, Beckwith to Church
153,000
1999
1211 Waukegan Road, Beckwith to Dempster
624,000
2000
If Menard Avenue/Alley North of Dempster/Marmora
209,000
2001
Avenue; connecting to Dempster
Anticipated Benefits (Increase in Service; Reduction
in Cost):
• Improved fire flow to all areas in the Village.
• Minimize the overtime required for Water Department personnel
conducting
repairs to the existing system.
1,647,000
..\CAP-TMP.TZ',.'97-DC
Village of Morton Grove - Capital Improvement Program
-PROJECT COST SU1,LKU%P1Y-
Date: 11/20Z96 Department: Community Development
Project Name: Water Main Improvements
- Construction Cost -
Construction Co9t Basis of estimate:
Bids Received Engineer, Architect, EX
E or Vendor Estimate
Comparable Facility Cost Standard Cost
Chicago Area
it of Estimate: 10/6/94
Cost estimates subsequent to FY 1998 have been increased by five (5) percent
per year to account for inflation®
1 N
Ally"
"4 r
Cost to
7Y
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$95,000
$36,300
$ 36,300
Design
Site
Acquisition
Equipment
Construction
$814,000
$624,000
$209,000
1,647,000
Misc.-
Construction
Inspection
61,050
46,800
15,675
123,525
Total
$95, 000
1 11
$36, 300
1 $ 8 7 5 , 0-5 0
$670,800
$224,675
$1,806,825
Construction Co9t Basis of estimate:
Bids Received Engineer, Architect, EX
E or Vendor Estimate
Comparable Facility Cost Standard Cost
Chicago Area
it of Estimate: 10/6/94
Cost estimates subsequent to FY 1998 have been increased by five (5) percent
per year to account for inflation®
1 N
Ally"
"4 r
Village of Morton Grove - Capital Improvement Program
PR%r-')U-rE1/1'-"T D%ES3%'"-RI1r%T-Lr0"%N
date: 11120/96 Department: Community Development
Project Name:- Church Street Rehabilitation - Linder Avenue to Austin Avenue
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project/Services to be Provided:
Replace deteriorated sidewalk, curb and gutter, and drainage structures;
replace 800 feet of 30 inch and 460 feet of 21 inch combined sewer with 61
service connections from Linder Avenue to Menard Avenue; replace the base and
pavement on Church Street between Linder Avenue and Mason Avenue, and on
Beckwith Road between Austin Avenue and Mason Avenue.
Implementation Schedule:
Construction - Fiscal Year 2000
C:\..\CAP-IMPR\97CSS
Village of Morton Grove - Capital Improvement Program
PL R 0 J EC %"- T CC-)IS T S TUJTk"U4AR-Y'
Date: — 11Z20/96 Department: Community Development
Project Name: Church Street Rehabilitation - Linder Avenue to Austin Avenue
- Construction Cost -
Construction Cost Basis of estimate:
Bids Received
Comparable Facility Cost
Date of Estimate: - 101•4
Engineer, Architect,
or Vendor Estimate
Standard Cost
Chicago Area
Motor Fuel Tax
Inter modal Surface Transportation Act (70% Federal Funds, 30% Local Funds)
Impact on Operating Costs:
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisiti,..-"-i
Equipment
Construc-
$1,487,700
$1,487,700
tion/Repair
Misc. -Soil &
165,300
165,300
Material
Testing/Phase
III
Engineering
Total
$1,653,000
$1,653,000
ag of
Village
$ 841,500
$ 841,500
Grove
Construction Cost Basis of estimate:
Bids Received
Comparable Facility Cost
Date of Estimate: - 101•4
Engineer, Architect,
or Vendor Estimate
Standard Cost
Chicago Area
Motor Fuel Tax
Inter modal Surface Transportation Act (70% Federal Funds, 30% Local Funds)
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
ite: 11/20/96 Department: Community Development
Project Name: Church Street Rehabilitation - Linder Avenue to Austin Avenue'
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
or Repair
Construction - Fiscal Year 1999
--:\..\CAP-TMPR\97CSS
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/20/96 Department: Community Development
Project Name: Church Street Rehabilitation - Linder Avenue to Austin Avenue
- Construction Cost -
Construction Cost Basis of estimate:
F-1
Bids Received Engineer, Architect, ix
E or Vendor Estimate I I
Comparable Facility Cost Standard Cost
Chicago Area
Date of Est- imate: 10/94
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
uate: 10/16/96 Department: Community Development
Project Name: Fernald Avenue Reconstruction-Lincoln Avenue to Dempster Street
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project/Services to be Provided:
Cost to
Fernald Avenue will be reconstructed with new curb and gutter,
sidewalk,
bituminous roadway drainage, driveway And parkway restoration
11 -Z
with striping
from Dempster Street to Lincoln Avenue.
FY 1998 -
Cost Elements
Date
Anticipated Benefits (Increase in Service; Reduction in Cost):
1999
• Reduction in maintenance required red by Public Works (street
patching and
structure repair).
F
V Y-2002
• Improved riding surface for residents.
• Improved drainage characteristics.
Evaluation Criteria Met:
Total
• Deteriorated Facility - Reconstruction of one of the most
deteriorated
streets in the Village.
$24,990
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Risk to Public Safety or Health - Elimination of hazards
to driving
public and pedestrians alike.
Design
• Increase in Property Value - Construction of a new street
enhances the
appearance of all properties adjacent to it.
Implementation Schedule:
Site
ase II Engineering - Design - Fiscal Year 1999
�-onstruction - Fiscal Year 2000
CAP-IMPR\97CDC
10/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/16/96 Department: Community Development
Project Name: Fernald Avenue Reconstruction-Lincoln Avenue to Dempster Street
- Construction Cost -
Comparable Facility Cost Standard Cost
Date of Estimate: October 1994
CAP---1MPR\97CDC
10/96
Cost to
FY
FY
FY
FY
7y
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
F
V Y-2002
Total
Planning/
$24,990
$ 24,1990
Design
Site
Acquisition
Equipment
Construction
$498,750
498,750
/Repair
Misc.
11
24,990
24,990
Total
$24,990
$523,740
$548,730
Comparable Facility Cost Standard Cost
Date of Estimate: October 1994
CAP---1MPR\97CDC
10/96
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
ate: 11/11/96 Department: Community Development
Project Name: Georgiana AvenueZSmithwood Drive Reconstruction
Type of Project:
Department: Community Development
Project Name: Georgiana Avenue/Smithwood Drive Reconstruction
Planning or Design
Equipment Purchase
Site Acquisition
Facility Construction
FY
FY
or Repair
FY
Description of Project/Services to be Provided:
Reconstruction of Georgiana Avenue from Capulina Avenue to Dempster Street
and Smithwood Drive from Georgiana Avenue to the Cul-de-sac:
Both streets have deteriorated and are in need of reconstruction. The
reconstruction will consist of the removal of the existing street and curb
and gutter; construction of a new bituminous street with new curb and gutter;
reconstructed drainage structures; and replacement of landscaping and
driveways as necessary. Is
The cost estimate for each street is as listed:
Georgiana Avenue $295,000
Smithw•• d Drive $106,500
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching)
• Improved riding surface for residents
• Improved drainage characteristics
Bid Documents Available February 2000
Sign Contract March 2000
Initiate Contract May 2000
Complete Construction September 2000
C:\..\CAP-IMPR\97CDC
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/11Z96
Department: Community Development
Project Name: Georgiana Avenue/Smithwood Drive Reconstruction
Construction Cost
Cost to
FY
FY
FY
FY
FY
FY 1998
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$ 10,000
$ 10,000
Design
Site
Acquisition
Equipment
Construction
$384,000
$384,000
Misc.- soils
7,500
7,500
& materials
Testing
Total
$401,500
$401,500
Construction Cost Basis of estimate:
Bids Received
Engineer, Architect,
or Vendor Estimate
Comparable Facility
Cost X Standard Cost
Chicago Area
Date of Estimate:
November 1996
Cost estimates have
been increased by five (5) percent per
year to account
for inflation.
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
ate: 10Z16/96 Department: Community Development
Project Name: Gross Point Road Reconstruction .
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project/Services to be Provided:
Gross Point Road through the Village has a rural cross section, with
deteriorated base, poorly maintained shoulders, and inadequate drainage.
This improvement will totally reconstruct the road, including replacement of
sidewalks, installation of drainage, and construction of curb and gutter
defining a pavement with two (2) parking lanes and two (2) through lanes.
The Village will be responsible for all costs connected with the construction
of the two (2) parking lanes per IDOT policy. 0
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Eliminate roadway flooding, which often extends into front yards.
• Provide a quality roadway for travelling public.
• Eliminate continued maintenance (grading) of shoulders to ensure proper
drainage and safe parking area.
Emplementation Schedule:
.?hase I Engineering - Fiscal Year 1999
Phase II Engineering - Fiscal Year 2000
Construction - Fiscal Year 2001
CAP - IMPR\ 97 CDC 10/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 10/16/96 Department: Community Development
Project Name: Gross Point Road Reconstruction
- Construction Cost -
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$41,685
$39,480
$ 81,165
Design
Site
Acquisition
Equipment
Construc-
$ 997,500
997,500
tion/Repair
Misc.
52,500
52,500
Total
$41,685
$39,480
$1,050,000
$1,131,165
Village of
$41,685
$11,844
$ 525,000
$ 578,529
Morton Grove
0
Basis of Construction Cost Estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost 0
Date of Estimate: October 1996
Standard Cost
Chicago Area
Intermodal Surface Transportation Act Funds
Illinois Department of Transportation Funds
CAP-IMPR\97CDC
0 6 • 0
10/96
1� J'ot
Village of Morton Grove - Capital Improvement Program
irate: November 21, 1996 Department: Community Development
Project Name: Menard Avenue Rehabilitation - Lincoln Avenue to Oakton Street
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project/Services to be Provided:
Repair, recycling, and resurfacing of Menard Avenue which is in the advanced
stages of deterioration/failure. This project would include the recycling of
the pavement; removal and replacement of defective curb and gutter, sidewalk
L the parkways as
and drainage structures; and strLJ_'_L.LJ. and tl-,- restoration of 1-11
required.
0
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching).
• Improved riding surface for residents.
• Improved drainage characteristics.
Mid Documents Available - February 1998
Sign Contract - March 1998
�nitiate Construction - April 1998
Complete Construction - September 1998
C:\..\CAP-IMPR\97CDC
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 21, 1996 Department: Community Development
Project Name: Menard Avenue Rehabilitation-Lincoln Avenue to Oakton Street
- Construction Cost -
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
Construc-
$400,000
$400,000
tion/ Repair
Misc. -Soil &
5,000
5,000
Mat'l
Testing
Total
$405,000
$405,000
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
E or Vendor Estimate
Comparable Facility Cost Standard Cost
E Chicago Area
Date of Estimate.* November 1996
I
Cost estimate has been increased by five (5) percent subsequent to FY 1998 to
account for inflation.
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: 11/20/96 Department: Community Development
Project Name: Beckwith Road Rehabilitation-Washington Street to Oriole Avenue
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction X
or Repair
Description of Project/Services to be Provided:
This project segment will require the improvements listed below:
Replacement of deteriorated sidewalk, and drainage structures; replacement of
all curb and gutter; and the recycling and resurfacing of the bituminous
pavement.
Based upon Illinois Department of Transportation and Federal Highway
Department criteria, this section of roadway must be widened by one (1) foot,
requiring the replacement of all curb and gutter.
Anticipated Benefits (Increase in Service; Reduction in Cost) :
• Reduction in maintenance required by Public Works (patching and drainage
structure repairs) .
• Improved riding surface for residents.
• Improved drainage characteristics.
Evaluation Criteria Met:
• Deteriorated Facility - Rehabilitation of deteriorated streets.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Risk to Public Safety or Health - Elimination of hazards to driving
public and pedestrians.
• Increase Property Value - Roadway is in poor condition, creating an
unnecessarily negative neighborhood image.
Implementation Schedule:
Construction - Fiscal Year 1999
CAP-/MPR\97CSS 12/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/20/96 Department: Community Development
Project Name: Beckwith Road Rehabilitation-Washington Street to Oriole Avenue
- Construction Cost -
Cost Cost to FY FY FY FY FY FY 1998 -
Elements Date 1998 1999 2000 2001 2002 FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
Construc- $683, 600 $683, 600
tion/Repair
Misc. - Soil 76, 000 - 76, 000
& Material
Testing/
Phase III
Engineering
Total $759,600
$759, 600
Village of $228, 000 $228, 000
Morton Grove
Basis of Construction Cost Estimate:
Bids Received Engineer, Architect, X
or Vendor Estimate
Comparable Facility Cost Standard Cost -
— Chicago Area
Date of Estimate: 10/96
Cost estimate has been inflated by five (5) percent per year subsequent to FY
1998 .
Financing Other Than Property Tax:
Motor Fuel Tax
Intermodal Surface Transportation Act (70% Federal Funds; 30% Local Funds)
Impact on Operating Costs:
Village
C�)ate: 11/20/96
Project Name: Beckw
Type of Project:
Planning or Design
of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Department: Community Development
ith Road Rehabilitation - Washington Street to Oriole Avenue
EEquipment Purchase
Site Acquisition Facility Construction �X
or Repair
Description of Project /Services to be Provided:
This project segment will require the improvements listed below:
Replacement of deteriorated sidewalk, and drainage structures; replacement of
all curb and gutter; and the recycling and resurfacing of the bituminous
pavement.
Based upon Illinois Department of Transportation and Federal Highway
Department criteria, this section of roadway must be widened by one (1) foot,
_-requiring the replacement of all curb and gutter.
anticipated Benefits (Increase in Service; Reduction in Cost) :
• Reduction in maintenance required by Public Works (patching and drainage
structure repairs).
• Improved riding surface for residents.
• Improved drainage characteristics.
Evaluation Criteria Met:
• Deteriorated Facility - Rehabilitation of deteriorated streets.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Risk to Public Safety or Health - Elimination of hazards to driving
public and pedestrians.
• Increase Property Value - Roadway is in poor condition, creating an
unnecessarily negative neighborhood image.
Implementation Schedule:
Construction
_A' -7MP2 \917=
- Fiscal Year 2000
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/20/96 Department: Community Development
Project Name: Beckwith Road Rehabilitation - Washington Street to Oriole Avenue
- Construction Cost -
Cost
Cost to
_ ^Y
=?
-Y
Ei
--
Pv 1998 -
Elements
Date
1998
1999
2000
2001
2072
of 2002
^otal
Planning/
Design
sire
Acquisition
Eq -I cmenc
Construe-
$683,600
i
.. ,500
lion /Repair
MiSc - Soil
7',000
70,000
x ma_eriai
Testing/
Phase !TT
Engineering
Total
$759,500
5753,500
Viaae of
$228,000
&229,000
M 3- Grove
Basis of Construction Cost Estimate:
I n
Bids Received Engineer, Architect, FY
or Vendor Estimate —
Comparable Facility Cost
Date of Estimate:
Standard Cost -
Chicago Area
Cost estimate has been inflated by five (5) percent per year subsequent to FY
1998.
Financing Other Than Propertv Tax:
Motor Fuel Tax
Intermodal Surface Transportation act (70% Federal Funds; 30% Local Funds)
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
(`,',te: 11/21196 Department: Community Development
Project Name: Normandy Avenue Rehabilitation- Beckwith Road to Golf Road
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition F1 Facility Construction
or Repair
Description of Project /Services to be Provided:
Repair, recycling, and resurfacing of Normandy Avenue which is in the
advanced stages of deterioration /failure. This project would include the
recycling of the pavement; removal and replacement of defective curb and
gutter, and drainage structures; striping; and the restoration of the
parkways as required.
icipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching, crack
sealing, and structure repair).
• Improved riding surface for residents
• improved drainage characteristics
Evaluation Criteria Met:
• Deteriorated Facility - All intersections are in advanced stages of
deterioration as well as all drainage structures and manholes
at these intersections; street cracking is becoming more
evident.
• Improvement of Operating Efficiency - Reduction of maintenance costs
• Risk to Public Safety or Health - Elimination of hazards to driving
public, cyclist, and pedestrians alike
• Protection of Investment - Roadway is spalling; surface must be
Protected or street will require complete replacement.
Implementation Schedule:
id Documents Available February 1998
Sign Contract March 1998
Initiate Contract April 1998
C:A..ACAP- I=V97CtC
1
I
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/21/96 Department: Communitv Development
Project Name: Normandy Avenue Rehabilitation- Beckwith Road to Golf Road
- Construction Cost -
Construction Cost Basis of estimate:
Bids Received Eligineer, Architect,
or Vendor Estimate
Comparable Facility Cost XI Standard Cost -
E Chicago Area
Date of Estimate: November 1996
Cost estimates subsequent to FY 1998 have been increased by five (S) percent
per _year to account for inflation.
Financing Other Than Property Tax: pyJ I'll, Motor Fuel Tax (MFT) L_/ Ve
U"
Impact on Operating Costs:
Cost to
FY
FY
FY
c
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Tocal
P1 a_____ng/
Design
Site
Acuuisition
- -
Eauiomen_c
Construction
$$204,000
$204,000
Misc.- Soils
2, 750
2,750
a Materials
Testing
Total
$206,750
$206,750
Construction Cost Basis of estimate:
Bids Received Eligineer, Architect,
or Vendor Estimate
Comparable Facility Cost XI Standard Cost -
E Chicago Area
Date of Estimate: November 1996
Cost estimates subsequent to FY 1998 have been increased by five (S) percent
per _year to account for inflation.
Financing Other Than Property Tax: pyJ I'll, Motor Fuel Tax (MFT) L_/ Ve
U"
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: 12/19/96 Department: Community Development
Project Name: Waukegan Road Corridor Improvements
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition F Facility Construction nX
or Repair
Description of Project /Services to be Provided:
Waukegan Road between Dempster Street and Golf Road has become the primary
commercial area in the Village. A major study of the corridor will be
completed in 1997 which analyses both physical and economic environment in an
attempt to generate the redevelopment of seemingly under -used sites. This
study will conclude with the completion of a Phase I Preliminary Engineering
report for submission to the Illinois Department of Transportation. The
Phase II, Engineering design will be undertaken in Fiscal Year 1998,
immediately upon receipt of IDOT approval of Phase I.
It is anticipated that street -scape improvements will be constructed in
Fiscal 1999, and include new street lighting and landscaping, street
furniture, sidewalks, and a twelve (12) inch water main between Beckwith Road
and Dempster Street.
ted Benefits (Increase in Service; Reduction in Cost):
The updated Village facilities are intended to make this commercial corridor
more attractive to consumers and.developers alike. The installation of the
water main will replace two (2) mains servicing the area which are prone to
breaks.
Evaluation Criteria Met:
• Deteriorated Facility - Many existing street lighting poles are cracked
or badly deteriorated; water mains are subject to breaks.
• Risk to Public Safety - The increased traffic has created opportunities
for accidents.
• Improvement of Operating Efficiency - The new high pressure sodium
lights will provide more light at a reduced cost; new water
main will enhance commercial service while minimizing repairs.
Implementation Schedule:
Design Improvements for
lConstruct Improvements
�
l
Waukegan - Fiscal Year 1999
along Waukegan Road - Fiscal Year 2000
CAP- IMPR\97CSS 12/96
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 12/16/96 Department: Community Development
1
Project Name: Waukegan Road Corridor Improvements
- Construction Cost -
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$11,852
$90,000
$ 90,000
Design
Site
Acquisition
Equipment
Construc-
$1,400,000
1,400,000
tion /Repair
Miss. - Cori-
100,000
100,000
struction
Engineering
Total
$11,852
$90,000
$1, Soo, 000
$1,590,000
Basis of Construction Cost Estimate:
—Bids Received Engineer, Architect,
(U X
or Vendor Estimate
Comparable Facility Cost 11
Date of Estimate:
Standard Cost -
Chicago Area
The cost estimate has not been increased to account for inflation.
Financing Other Than Property Tax:
Motor Fuel Tax
TIF District Revenues
Impact on Operating Costs:
a
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Late: 11/12/96 Department: Community Development
Project Name: Waukegan Road Lighting
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction X
or Repair
Description of Project /Services to be Provided:
Remove seventy -eight (78) mercury vapor street lights and poles and replace
with sixty -four (64) new poles and high pressure sodium fixtures from
Dempster Street to Golf Road along Waukegan Road. The analysis of existing
facilities indicates that new conduit and controllers will be required to
complete the installation. This will require the removal and replacement of
a substantial portion of sidewalk.
Anticipated Benefits (Increase in Service; Reduction in Cost):
The lighting will be upgraded to current State standards using high pressure
sodium lights. The use of this type of lighting will provide for improved
lighting at reduced energy cost.
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/12/96 Department: Community Development
Project Name: Waukegan Road Lighting
- Construction Cost -
Cost
Cost to
FY
cl
FY
FY
ry
� 1998 -
Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$11,852
Design
site
Acauisition
Eauipment
Construc-
$1 7,,725
$471,725
tion /Repair
Misc.- Con-
25,000
25,000
srructicn
Engineering
Total
$11,852
$A96,725
$495,725
Basis of Construction Cost Estimate:
Bids Received Engineer, Architect,
7 or Vendor Estimate F FIX
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: 10/94
The cost estimate has not been increased to account for inflation.
Evaluation Criteria Met: Financing Other Than Property Tax:
• Deteriorated Facility - Many existing poles are cracked or badly Motor Fuel Tax
deteriorated. TIF District Revenues
• Risk to Public Safety - The existing poles structure integrity has been
severely reduced by extensive cracking and missing pieces.
• Improvement of operating Efficiency - The new high pressure sodium
lights will provide more light at a reduced cost.
Impact on Operatina Costs:
Implementation Schedule:
1.
Design Lighting System along Waukegan ', - Fiscal Year 2000
Replace Existing Lighting System - Fiscal Year 2000
CAP- IMPR\97CS5
S'
Village of Morton Grove - Capital Improvement Program Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
'?ate: 11/20196 Department: Community Development
Project Name: Beckwith Road Rehabilitation - Austin Avenue to Waukegan Road
Type of Project:
Planning or Design Equipment Purchase F
Site Acquisition Facility Construction �X
Description of Project /Services to be Provided:
Replacement of deteriorated sidewalk, curb and gutter, drainage structures,
and bicycle lanes; the recycling and resurfacing of the bituminous pavement
on Beckwith Road between Austin Avenue and Waukegan Road.
Street widening of approximately five (5) feet at the Waukegan Road
intersection will be required.
The installation of a twelve (12) inch water main from Waukegan Road to Nagle
Avenue and an eight (8) inch water main from Nagle Avenue to Naragansett
Avenue will be undertaken with this project.
ticipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching and drainage
structure repair).
• Improved riding surface for residents.
• Improved drainage characteristics.
• Increased safety for drivers, cyclists, and pedestrians using the
roadway.
Evaluation Criteria Met:
• Deteriorated Facility - Rehabilitation of deteriorated streets.
• Improvement of Operating Efficiency - Reduction of maintenance costs.
• Risk to Public Safety or Health - Elimination of hazards to driving
public, pedestrians and bicyclists.
• Protection of Investment - Roadway is in good condition with minor base
failure; bicycle paths must be completely replaced.
Implementation Schedule:
Construction - Fiscal Year 2001
C:A..AoAP- 1HPRV99CS8
PROJECT COST SUMMARY
'r
Date: 11/20/96 Department:
Project Name:
- Construction Cost -
Construction Cost Basis of estimate: n
Bids Received Engineer, Architect, X
n or Vendor Estimate LLEX
Comparable Facility Cost Standard Cost -
i
Chicago Area
Date of Estimate: November 1996
Cost estimate has been inflated by five (5) percent per year subsequent to FY
1998.
Financina Other Than Property Tax:
Motor Fuel Tax
Intermodal Surface Transportation Act.(70% Federal Funds and 30% Local
Funds).
Bike Path Funding
Delaine Farm Escrow - Water Main $119,808.75
Delaine Farm Escrow - Left Turn Lanes 110,000.00
Impact on Operating Costs:
Cost co
E1
9Y
FY
FY
FV
FY 1999 -
Cosc Elements
Dace
1992
1999
2000
2001
2002
FY 2002
To -_al
Manning/
Design
Site
_-'1Cauisition
Eauioment
Construction/
$1,838,700
$1,832,700
Meoair
Misc.- Soil &
205,300
204,300
Material
Testing /Phase
III Engineer-
ing
Total
$2,053,000
$2,043,000
Village of
$ 807,900
$ 807,900
Morton Grove
Construction Cost Basis of estimate: n
Bids Received Engineer, Architect, X
n or Vendor Estimate LLEX
Comparable Facility Cost Standard Cost -
i
Chicago Area
Date of Estimate: November 1996
Cost estimate has been inflated by five (5) percent per year subsequent to FY
1998.
Financina Other Than Property Tax:
Motor Fuel Tax
Intermodal Surface Transportation Act.(70% Federal Funds and 30% Local
Funds).
Bike Path Funding
Delaine Farm Escrow - Water Main $119,808.75
Delaine Farm Escrow - Left Turn Lanes 110,000.00
Impact on Operating Costs:
V
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
`vate• 11/5/96 Department: Community Development
Project Name: Capulina Storm Sewer Extension
Type of Project: n
Planning or Design Equipment Purchase
Site Acquisition a Facility Construction PX
or Repair
Description of Project /Services to be Provided:
Extend Capulina storm sewer approximately 3,640 feet from Austin Avenue to
Central Avenue:
Capulina
- Austin to Marmora -
660
feet
of
84
inch
RCP
Capulina
- Marmora to Major -
1,320
feet
of
60
inch
RCP
Major
- Capulina to Crain -
300
feet
of
36
inch
RCP
Crain
- Major to Central -
660
feet
of
36
inch
RCP
Lateral "Lines
on Side Streets -
700
feet
of
27
inch
RCP
his project will be undertaken only after the impact of the TARP project is
Ud11y assessed. It is anticipated that TARP will be fully operational by
July 1998.
Anticipated Benefits (Increase in Service; Reduction in Cost):
• To provide for improved storm water drainage in the area.
• Separate the storm drainage from the combined sewer system.
Evaluation Criteria Met:
cI
D
a
New or substantially expanded facility - This will provide for
elimination of storm drainage from the combined sewer system
Risk to public health - The reduced flow in the combined sewer system
should reduce the likelihood of sewage back -ups into
basements.
Provide equal services - This will provide storm sewers in a combined
sewer area, similar to Parkview and South Central.
.cJ Impact on Operating Costs:
Implementation Schedule:
'Design Fiscal Year 2001
Construction - Fiscal Year 2002
CAP- 1.,9Pa \97CSS
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/5/96 Department: Community Development
Project Name: Capulina Storm Sewer Extension
- Construction Cost -
Cost
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Elements
Date
1998
1999
2000
2001
2002
FY 2002.
Total
Planning/
$135,000.
$ 135,000
Design
Site
Acquisition
Sauiument
Construe-
2,':00,000
2,b00,000
tion /Reoair
Misc.- Con -
135,000
135,000
struccion
Insnect_on
Total
J=
$135,000
$2,735,000
$2,870,000
Basis of Construction Cost Estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost I
Date of Estimate:
Standard Cost -
Chicago Area
Cost estimates have been increased by five (5) percent per year subsequent to
the date of the original estimate.
Financing Other Than Property Tax:
Low - interest Loan from IEPA
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
I�''!',',�Date: 11/11/96 Department: Community Development
Project Name: School Street Reconstruction
Type of Project:
Planning or Design n Equipment Purchase F
Site Acquisition Facility Construction 1X
or Repair
Description of Project /Services to be Provided:
Reconstruction of School Street from Lincoln Avenue to Dempster Street:
The street has deteriorated and is in need of reconstruction. The
reconstruction will consist of the removal of the existing street and curb
and gutter; construction of a new bituminous street with new curb and gutter;
reconstructed drainage structures; and replacement of landscaping and
driveways as necessary.
Anticipated Benefits (Increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching)
• Improved riding surface for residents
• Improved drainage characteristics
Evaluation Criteria Met:
• Deteriorated Facility - Reconstruction of a street that is in a
deteriorated state.
•Improvement of operating Efficiency - Reduction of maintenance costs
• Risk to Public Safety or Health - Elimination of hazards to driving
public, cyclist, and pedestrians alike
• Protection of Investment - Surfacing provides protection to base
Implementation Schedule:
)Bid Documents Available February 2001
Initiate Contract May 2001
Complete Construction November 2001
C: \.. \CAP- INPR \99CD2 12/96
'Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
,`) "ate: 11/11/96 Department: Community Development
Project Name: School Street Reconstruction
- Construction Gnat -
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost X Standard Cost -
Chicago Area
Date of Estimate: November 1996
Financing Other Than Property Tax:
Motor Fuel Tax (MFT)
Impact on operating Costs:
Cost to
FY
FY
rFY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
Construction
$570,000
$570,000
Misc.- Soils
7,500
7,500
& Materials
Testing
Total
$577,500
$577,500
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost X Standard Cost -
Chicago Area
Date of Estimate: November 1996
Financing Other Than Property Tax:
Motor Fuel Tax (MFT)
Impact on operating Costs:
V
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
te: 11/11/96 Department: Community Development
Project Name: School Street Reconstruction
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction
11 A o» a i r !!! 111
Description of Project /Services to be Provided:
Reconstruction of School Street from Lincoln Avenue to Dempster Street:
The street has deteriorated and is in need of reconstruction. The
reconstruction will consist of the removal of the existing street and curb
and gutter; construction of a new bituminous street with new curb and gutter;
reconstructed drainage structures; and replacement of landscaping and
driveways as necessary.
Anticipated Benefits (increase in Service; Reduction in Cost):
• Reduction in maintenance required by Public Works (patching)
• Improved riding surface for residents
• Improved drainage characteristics
Evaluation Criteria Met:
• Deteriorated Facility - Reconstruction of a street that is in a
deteriorated state.
• Improvement of Operating Efficiency - Reduction of maintenance costs
• Risk to Public Safety or Health - Elimination of hazards to driving
public, cyclist, and pedestrians alike
• Protection of Investment - Surfacing provides protection to base
Implementation Schedule:
(_jd Documents Available
Sign Contract
Initiate Contract
Complete Construction
2:A..AC4P- IMPR \97CDC
February 2001
March 2001
May 2001
September 2001
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/11/96 Department: Community Development
Project Name: School Street Reconstruction
- Construction Cost -
i,
Construction Cost Basis of estimate:
Bids Received Engineer, Architect, H
or Vendor Estimate L
Comparable Facility Cost IXI S'�andard Cost -
Chicago Area
Date of Estimate: November 1996
i
Financina Other Than Property Tax:
Motor Fuel Tax (MFT)
Impact on Operating Costs:
Cost to
cY
FY
8Y
FY
FY
c7 1998
Cost Elements
Date
1998
1999
2000
2001
2002
?? 2002
Total
Planning/
Desi a. n
site
Acquisition
Squioment
Construction
$570,000
$570,000
Misc. - sobs
7;500
7,500
& Mate -iais
Testing
Total
I
$577,500
$577,500
i,
Construction Cost Basis of estimate:
Bids Received Engineer, Architect, H
or Vendor Estimate L
Comparable Facility Cost IXI S'�andard Cost -
Chicago Area
Date of Estimate: November 1996
i
Financina Other Than Property Tax:
Motor Fuel Tax (MFT)
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
ate: 11120/96 Department: Community Development
Project Name: Beckwith Road - Waukegan Road to Oriole Avenue
Type of Project:
Planning or Design Equipment Purchase
f
Site Acquisition Facility Construction �X
or Repair
Description of Project /Services to be Provided:
This segment of roadway will require the following improvement:
i
Replacement of deteriorated sidewalk_, curb and gutter, and drainage
structures; full depth patching of the bituminous pavement in various
locations; grinding of the edge of the bituminous pavement and installation
of area reflective crack control treatment; the installation of 3" of
bituminous pavement; and stripping of the new bituminous pavement.
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 11/20/96 Department: Communitv Development
Project Name: Beckwith Road - Waukegan Road to Oriole Avenue
- Construction Cost -
Cost
Cos- Co
^Y
FV
cV
FY
ay
FY 1998 -
Elements
Da-=_
1998
1999
2000
2001
2902
FY 2002
j
Comparable Facility Cost
Standard Cost -
• Improved riding surface for residents.
Chicago Area
Total
Planning/
I
Date of Estimate: October 1996
Design
Cost estimate has been inflated by
five (5) percent per year
subsequent to FY
1998.
site
• Deteriorated Facility - Rehabilitation of deteriorated street.
Financing Other Than Property Tax:
ACT-'isition
Motor Fuel Tax
• Risk to Public Safety or Health - Elimination of hazards to driving
Intermodal Surface Transportation
Act (70% Federal Funds; 30%
Local Funds)
Eauipment
• Protection of Investment - Roadway is in good condition with minor base
Construc-
Implementation Schedule:
Impact on Operating Costs:
$720,000
$720,000
ion /Repair
/\
Cconstruction - Fiscal Year 2002
Misz - Soil
3x,000
80,000
& Material
_
Testing
Total
$800,000
f $800,000
V_llage of
IF
$250,000
$25'0,000
Morton Grove
Basis of Construction Cost Estimate:
CAP- IMR? \99CS3
Bids Received
Engineer, architect,
X
Anticipated Benefits (Increase in Service; Reduction in Cost):
or Vendor Estimate
j
Comparable Facility Cost
Standard Cost -
• Improved riding surface for residents.
Chicago Area
• improved drainage characteristics.
I
Date of Estimate: October 1996
Cost estimate has been inflated by
five (5) percent per year
subsequent to FY
1998.
Evaluation Criteria Met:
• Deteriorated Facility - Rehabilitation of deteriorated street.
Financing Other Than Property Tax:
• Improvement of Operating Efficiency - Reduction of maintenance costs.
Motor Fuel Tax
• Risk to Public Safety or Health - Elimination of hazards to driving
Intermodal Surface Transportation
Act (70% Federal Funds; 30%
Local Funds)
public & pedestrians.
• Protection of Investment - Roadway is in good condition with minor base
failure.
Implementation Schedule:
Impact on Operating Costs:
/\
Cconstruction - Fiscal Year 2002
CAP- IMR? \99CS3
Village
of
Morton Grove - Capital Improvement Program
FY
FY
PROJECT DESCRIPTION
FY
Cate :November 27, 1996
Cost Elements
Department: FinanQQ Department
-
Project Name: IInorade
or
Purchase of New TalQphone System
2002.
FY 2002
Type of Project:
Planning/
Planning or Design
Equipment Purchase
�X
Site Acquisition
n
Facility Construction
a
Description of Project /Services to be Provided:
Upgrade in NEC telephone system software which provides all telephone
communication (except 9- 1 -1)for Village Hall, Police Department, Fire
Department (2 buildings), and Public Works facilities in order to take
advantage of the latest technological advances and to better serve Village
residents. The current telephone system (installed in June of 1986) was
intended to have a life expectancy of eight (8) to ten (10) years.
Anticipated Benefits (Increase in Service; Reduction in Cost):
�i. Tag Phone System for 9 -1 -1 (Required by law when current phone system is
replaced or updated). Allows dispatcher to know exact location in building
where emergency call originates.
2. Automatic Call Distribution (ACD) during peak telephone periods which
would make sure all calls are processed and answered in an orderly fashion in
case the operator is inundated with phone calls.
3. Establishment of a twenty -four (24) hour hotline which would be updated
and have special telephone numbers for the public, i.e. snow removal, civic
events, and recycling and garbage information.
4. Voice mail and interactive voice response allowing retrieval of
information normally available only during business hours.
Evaluation Criteria Met:
Systematic Replacement: As stated above, an upgrade or replacement of
telephone system will allow the Village to take advantage of technological
advancements in the telephone communications industry that were not available
ten (10) years ago.
Substantially Expanded Equipment: The new system, with the four (4) added
features, will improve operating efficiency and productivity by reducing
business hour calls, i.e. 24 -hour hotline, thereby providing a level of
service to Village residents, vendors, businesses, etc. that is not now
available.
Implementation Schedule:
Fiscal Year 1998
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 27, 1996 Department: Finance Department`
Project Name: Upgrade or Purchase of New Telephone System
- Construction Cost -
Construction Cost Basis of estimate:
Bids Received a
I
Comparable Facility Cost
Engineer, Architect, L
or Vendor Estimate
Standard Cost -
Chicago Area
Date of Estimate: Novem"30W-WVJ*1�
t •- - - -
•n - - e-
Financing other Than Property ax:
Installment Note Financing
Impact on Operating Cos
Increase in line charges of $300-$400 per month to Ameritech (the Village
currently pays $900 per month) . While the Village currently pays an
estimated $7500 per year in maintenance costs, it is anticipated that
maintenance will be the same or less due to the fact that alternative
maintenance plans are available through private insurance carriers. These
alternative carriers will increase competition for current telephone
communications equipment companies and provide the consumer with the same or
reduced maintenance costs.
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998.
1999
2000
2001
2002.
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
$73,000
$46,800
-
$46,80.0
in June
1996
Construction
misc.
Total
$73,000
$96,800
$46,800
in June
-
1996
Construction Cost Basis of estimate:
Bids Received a
I
Comparable Facility Cost
Engineer, Architect, L
or Vendor Estimate
Standard Cost -
Chicago Area
Date of Estimate: Novem"30W-WVJ*1�
t •- - - -
•n - - e-
Financing other Than Property ax:
Installment Note Financing
Impact on Operating Cos
Increase in line charges of $300-$400 per month to Ameritech (the Village
currently pays $900 per month) . While the Village currently pays an
estimated $7500 per year in maintenance costs, it is anticipated that
maintenance will be the same or less due to the fact that alternative
maintenance plans are available through private insurance carriers. These
alternative carriers will increase competition for current telephone
communications equipment companies and provide the consumer with the same or
reduced maintenance costs.
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIP`PION
Ulte: Novembgr 27- 1996 Department: Finangg Department
Project Name: Replacemgnt of High-VgIMme Central Copier MaQhine
Type of Project:
Planning or Design a Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project /Services to be Provided:
Replacement of High- Volume copier (Xerox 5680) located in the Finance
Department. Currently, the copier provides central copying needs for all
Departments in the Village. Depending on the month, i.e. budget cycle, the
high- volume copier produces approximately 60,000 to 70,000 copies per month
or 720,000 to 840,000 copies per year. The current high- volume copier was
leased as a new piece of equipment in August of 1995. The five (5) year
lease and subsequent buy -out clause expires in August of 2000.
?nticipated Benefits (Increase in Service; Reduction in Cost):
To take advantage of anticipated technological advances in the high- volume
copier industry that would promote greater productivity and efficiency in
completing walk -up or major copying projects for all Departments. It is
anticipated that technological advancements in copy -per- minute speed,
reduction /enlargement capabilities, automatic insertion of divider pages, and
custom margin shifting, etc. warrant the purchase of a new copier.
As stated above, technological advances will 'help to insure less downtime
that is experienced with all copiers, i.e. aging parts, environmental
changes, etc.
Evaluation Criteria Met:
Systematic replacement to provide the same or greater level of high - volume
copier service for all Departments in the Village. The current lease
agreement from Xerox provides a seven (7) year Total Satisfaction Guarantee
that covers the copier as well as all accessories. This guarantee expires in
FY 2002.
In order to replace a high - volume copier with the anticipated technological
'improvements as stated above and eliminate the possibility of increased
operational costs due to costs previously covered under the Total
Satisfaction Guarantee, the systematic replacement of this machine is
necessary.
Implementation Schedule:
Fiscal Year 2002
V
i
t
r
t
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 27, 1996 Department: Finance Denartment
Project Name: Eeplacement of High-Volume entral Copier Machine
Construction Cost
FY FY FY FY FY 1998 -
Cost Elements Date 1998 1999 2000. 2001 2002 FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment -0- $30,000 $30,000
Construction
Total -0- $30,000 $30,000
Construction Cost Basis of estimate:
Bids Received 0
Comparable Facility Cost 0
Engineer, Architect,
or Vendor Estimate
(See Note)
Standard Cost -
Chicago Area
Date of Estimate: November 26. 1996 _
Note: Estimated 5% increase per year from current cost.
Installment Note Financing
The current copier costs approximately $10,000 per year to maintain. This
cost includes both supplies and the maintenance agreement. It is anticipated
that maintenance will be about the same, due to the fact that alternative
maintenance plans are available through private insurance carriers. These
alternative carriers will increase competition for current copier companies
and provide the consumer with the same or reduced maintenance costs.
Cost to F
FY F
Site
Acquisition
Equipment -0- $30,000 $30,000
Construction
Total -0- $30,000 $30,000
Construction Cost Basis of estimate:
Bids Received 0
Comparable Facility Cost 0
Engineer, Architect,
or Vendor Estimate
(See Note)
Standard Cost -
Chicago Area
Date of Estimate: November 26. 1996 _
Note: Estimated 5% increase per year from current cost.
Installment Note Financing
The current copier costs approximately $10,000 per year to maintain. This
cost includes both supplies and the maintenance agreement. It is anticipated
that maintenance will be about the same, due to the fact that alternative
maintenance plans are available through private insurance carriers. These
alternative carriers will increase competition for current copier companies
and provide the consumer with the same or reduced maintenance costs.
Construction Cost Basis of estimate:
Bids Received 0
Comparable Facility Cost 0
Engineer, Architect,
or Vendor Estimate
(See Note)
Standard Cost -
Chicago Area
Date of Estimate: November 26. 1996 _
Note: Estimated 5% increase per year from current cost.
Installment Note Financing
The current copier costs approximately $10,000 per year to maintain. This
cost includes both supplies and the maintenance agreement. It is anticipated
that maintenance will be about the same, due to the fact that alternative
maintenance plans are available through private insurance carriers. These
alternative carriers will increase competition for current copier companies
and provide the consumer with the same or reduced maintenance costs.
I
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
ate: November, November, 1996 Department: Fire
Project Name: Ambulance Replacement f
Type of Project:
Planning or Design Equipment Purchase �X `
I�
Site Acquisition Facility Construction {
or Repair
'f
Description of Project /Services to be Provided:
This project is the replacement of Station 4's ambulance, with a medium duty chassis
advanced life support unit, and associated communications equipment. our previous plan of i
re- chassising the existing Ambulance 4 with a medium duty chassis, has been investigated and
it has been determined that limited success has been seen with the re- chassising of alight
duty ambulance box to a medium duty chassis. Discussions with the maintenance supervisort
and the Fire Department's apparatus replacement committee have indicated that it would be in
the best interest of the Village to replace the existing ambulance with a new medium duty
chassis advanced life support unit. The existing unit could then be modified in -house by
the Public Works' Maintenance Division and utilized by Public Works as a service vehicle for
the Water Department. We have observed other departments in their re- chassising efforts ,
and, while this was initially thought to he the most practical method of providing a state-
_';f-the-art vehicle for emergency medical services, the continued maintenance and
mpatibility of the light duty box and the medium duty chassis have proven to be
problematic for both field activities and vehicle maintenance.
i
This request includes funds to replace the communications equipment for this unit both from
the fire emergency andmedical /telemetry aspect. Other equipment such as SC3A packs and
medical support equipment are also being purchased.
i
Anticipated Benefits (Increase in Service; Reduction in Cost):
Scheduled replacement of department apparatus to provide optimal readiness for emergency
operations, and the inclusion of any enhancements required by the Illinois Department of
Public Health or the regional Emergency Medical Services office. This expenditure would
satisfy the needs of the Fire Department by providing a vehicle which would meet EMS needs
while also providing acost effective replacement vehicle for Public Works in the vehicle
being replaced.
Evaluation Criteria Met:
DETERIORATED APPARATUS: Front line life expectancy for emergency operations would have
been reached by this point.
EQUITABLE PROVISION: continuation of a high level of emergency medical care.
OPERATIONAL, EFFICIENCY: Timely replacement will ensure service life of the vehicle for
use in alternate capacity in the Village.
SYSTEMATIC REPLACEMENT: Replacement is based on the Fire Department's vehicle
replacement schedule.
COORDINATION: To maintain operational readiness consistent with intra-
governmental response agreements.
�JAFETY & HEALTH: A vehicle of this type is needed to support advanced life
support activities.
Implementation Schedule:
Purchased in Fiscal Year 1938
(Construction - June through August, 1997)
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November, 1996 Department:
Project Name: Ambulance Replacement
- Construction Cost
Cost Elements
Cost to
Date
FY
1998
FY
1999 -
FY
2000
FY
2001
FY
2002
FY 1998 -
FY 2002
Total
Planning /
Design
Site
Acquisition
Equipment
$134,000
$134,000
Construction
Misc.
Total
$134,000
$134,000
Construction Cost Basis of estimate:
Bids Received
Comparable Facility Cost
Date of Estimate:
Financing Other Than Property Tax:
Revolving Equipment Replacement Loan
Impact on Operating Costs:
Engineer, Architect,
'or Vendor Estimate
Standard Cost —
Chicago Area
Village of Morton Grove — Capital Improvement Program
PROJECT DESCRIPTION
Date:November, 1995 Department: Fire
Project Name: Fire Encrine Replacement
Type of Project: i
Planning or Design Equipment Purchase j
i
Site Acquisition Facility Construction i
or Repair
Description of Project /Services to be Provided:
This project is the replacement of Station 5's 1500 GPM fire engine. The
current Engine 5 would become the department's reserve apparatus, and based
upon the expected monetary return for the current reserve apparatus, either
as a trade -in or being sold outright, a determination would need to be made
if this vehicle would be retained by the department as an additional reserve
unit or possibly transferred to the Regional Training Facility, where it
could serve as a training aid and back -up equipment for the area. No credit
has been taken in the estimated cost of this project for the sale or trade -in
0 ,3f the current reserve unit. The replacement in the year indicated would
provide a more staggered approach to the vehicle replacement program of the
department than previously experienced. This request includes funds to
replace the communication equipment for the unit and other equipment such as
older hose and 4 non - compliant SCBA units.
Anticipated Benefits (Increase in Service; Reduction in Cost):
Scheduled replacement of department apparatus to provide optimal readiness
for emergency operations, and the inclusion of any enhancements required by
the Illinois Department of Labor or applicable safety standards governing
fire apparatus.
Evaluation Criteria Met:
DETERIORATED APPARATUS:
EQUITABLE PROVISION:
OPERATIONAL EFFICIENCY:
SYSTEMATIC REPLACEMENT:
COORDINATION:
(✓SAFETY & HEALTH:
Front line life expectancy for emergency operations
would have been reached by this point.
Continuation of a high level of emergency services.
Timely replacement will extend the service life of
the department's fleet.
Replacement is based on the Fire Department's
vehicle replacement schedule.
To maintain operational readiness consistent with
intra - governmental response agreements
A vehicle of this type is needed to support fire
suppression activities.
Implementation Schedule:
Purchased in Fiscal 1998 1999 h February, 1999
rnr .qtruction - May, g
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November, 1996 Department: Fire
Project Name: Fire Engine Replacement
- Construction Cost -
Cost Elements
Cost. to
Date
FY
1998
Fy
1999
FY
2000
FY
2001
FY
2002
FY 1998 -
FY 2002
Total
Planning/
Design
site
Acquisition
_
Equipment
$297,000
$297,000
Construction
Misc.
Total
$297,000
$297,000
Construction Cost Basis of estimate:
IBids Received Engineer, Architect, X
or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate:
i
1
;1
Financing Other Than Property Tax:
Revolving Equipment Replacement Loan
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
ate:
November.
1996
Department: Fire
FY
2000
Project
Name:
Command
Vehicle Replacement
Type of Project:
Planning or Design Equipment Purchase �X
Site Acquisition Facility Construction
or Repair
Description of Project /Services to be Provided:
This project is the replacement of the Fire Department's incident command vehicle and the
down- grading of the existing unit to a utility vehicle status. With a five year rotation
plan, which this purchase would be a part of, the department's support vehicles would have a
15 year life cycle, functioning, for the first 5 years, as the incident.command vehicle, the
second 5 years as the Fire Prevention Bureau and Public Education vehicle, and the. third 5
years as the department's utility vehicle. This type of rotation provides the department
with a back -up command vehicle during maintenance and also apparatus which could be utilized
to transport patients or equipment as different situations present. The cost of this
pr6gram is based on the purchase and outfitting of the department's incident command vehicle
in 1994. This includes the replacement of all emergency lights /warning devices and
ommunications equipment. The radio equipment in the support vehicles were initially
F(-, archased in the late 170's and, in some cases, the equipment has been remounted in two
`vehicles, and its service life will have been reached when replacement vehicle is purchased
in the year 2000. A 3.5% annual cost increase has been estimated for this project to
establish the projected expenditure.
Anticipated Benefits (Increase in Service; Reduction in Cost):
Scheduled replacement of department apparatus to provide optimal readiness for emergency
operations, and the inclusion of any enhancements required by the Illinois Department of
Labor or applicable safety standards governing fire apparatus.
Evaluation Criteria
Met:
FY
1998
DETERIORATED APPARATUS:
FY
2000
Front line life expectancy for emergency operations would have
FY
2002
FY 1998 -
FY 2002
Total
been reached by this point.
EQUITABLE PROVISION:
Continuation of a. high level of emergency services.
OPERATIONAL EFFICIENCY:
Timely replacement will extend the service life of the
Site
Acquisition
department's fleet.
SYSTEMATIC REPLACEMENT:
Replacement is based on the Fire Department's vehicle
replacement schedule.
COORDINATION:
Equipment
To maintain operational readiness consistent with intra-
governmental response agreements.
SAFETY & HEALTH RISK:
Incident Command is essential to the proper handling of
$44,500
Construction
emergency incidents and a vehicle of this type is necessary to
perform this activity.
Implementation Schedule:
Purchased in Fiscal
Year
2000
(Ordered — October,
1999
Acceptance - January, 2000)
E
4
i
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November, 1996 Department:
Project Name: Command Vehicle Replacement
— Construction Cost -
Cost Elements
Cost to
Date
FY
1998
FY
1999
FY
2000
FY
2001
FY
2002
FY 1998 -
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
I
$44,500
$44,500
Construction
Misc.
Total
$44,500
$44,500
Construction Cost Basis of estimate:
Bids Received n
Comparable Facility Cost n
Date of Estimate:
Financing Other Than Property Tax:
Revolving Equipment Replacement Loan
Impact on Operating Costs:
Engineer, Architect, X
`or Vendor Estimate
Standard Cost -
Chicago Area
i
Village of Morton Grove — Capital Improvement Program
PROJECT DESCRIPTION
Date: 12/2/96 Department: Health & Human Services - Senior Services
i
Project Name: Seniortran Replacement
Type of Project:
Planning or Design r� Equipment Purchase IM,
Site Acquisition J Facility Construction El
or Repair
Description of Project /Services to be Provided:
Replacement of the existing seniortran bus which is in its seventh year
of service, Currently, this vehicle has a total mileage of ninety -four
thousand. We anticipate a continued accumulation of twelve to fifteen
thousand miles per year. This vehicle has a useful life of around ten
yearsand well over one - hundred thousand miles.
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 12/2/96 i I h& H S S S
Project Name: _
Department: ea t uman ervices en or e
Seniortran Replacement
- Construction Cost -
Basis of Construction Cost Estimate:
Engineer, Architect,
Bids Received or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Anticipated Benefits:
To continue the routine, uninterrupted service to our senior residents. Date of Estimate: 12/2/96
Not replacing this vehicle on a timely basis will result in greatly
increased maintenance cost and interruptions in service.
Financinct Other Than Property Tax: `
Evaluation Criteria Met:
Sytema.tic replacements
Coordination R meets established goals and objectives of the Board of
Trustees, Improvement of operating efficiency.
Implementation Schedule:
Fiscal Year 1999
❑®
❑■
Impact on operating Costs:
v
FY
'V
_
rY
_ ry
!
DaCen
=998
' -999
2000
200:
2 62
_
?1ar_ni:- g/
Des ign.
ACT sic ion
Squipmenc
$54, 000
$54,000
construc-
tion /Repair
Misc.
total
$54;000
$54,000
Basis of Construction Cost Estimate:
Engineer, Architect,
Bids Received or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Anticipated Benefits:
To continue the routine, uninterrupted service to our senior residents. Date of Estimate: 12/2/96
Not replacing this vehicle on a timely basis will result in greatly
increased maintenance cost and interruptions in service.
Financinct Other Than Property Tax: `
Evaluation Criteria Met:
Sytema.tic replacements
Coordination R meets established goals and objectives of the Board of
Trustees, Improvement of operating efficiency.
Implementation Schedule:
Fiscal Year 1999
❑®
❑■
Impact on operating Costs:
v
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date>Nbvember 25, 1996 Department: Municipal Building Maintenance
Project Name: Flickinger Center Remodeling
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction x
or Repair
Description of Project /Services to be Provided:
The Flickinger Center opened in 1980, and since then only minimal'
redecorating has occurred.- Pxograms and personnel have been added at both
Village Hall and the Police Department, which are creating space
utilization problems throughout the building. Senior Citizen programs
have expanded further challanging space allocation. A feasibility study
was completed in 1995 which identified major problem areas, A.D.A.
compliance, and refurnishing. The implementation schedule provides for
final facility design and=phased- construction.
Anticipated Benefits:
Increased efficiency in operations due to re- grouping of functions and
personnel; properly equiped work areas to enhance efficiency and service
to the public.
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 25, 1996 Department: Municipal Building Maintenance
Project Name: Flickinger Center _Remodeling
- Construction Cost -
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: November 25, 1996
Financing Other Than Property Tax:
I
i
Evaluation Criteria Met:
Deteriorated facility
Systematic replacement
Improvement of operating efficiency
Equitable provisions of services and facilities
Impact on Operating Costs:
Implementation Schedule:
FY 1998 - Select architect and begin design plans
(�FY 1999 - Complete design plans
FY 2000 - Begin phase construction'
FY 2001 - Complete phase construction
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$11,400
$25,000
$150,000
$ 175,000
Design
Site
Acquisition
Equipment
$ 50,000
$ 50,000
100,000
Construction
1, 500, 000
1,500,000
3,000,000
/Repair
Misc.
Total
$11,400
$25,000
$150,000
$1,550,000
$1,550,000
$3,275,000
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: November 25, 1996
Financing Other Than Property Tax:
I
i
Evaluation Criteria Met:
Deteriorated facility
Systematic replacement
Improvement of operating efficiency
Equitable provisions of services and facilities
Impact on Operating Costs:
Implementation Schedule:
FY 1998 - Select architect and begin design plans
(�FY 1999 - Complete design plans
FY 2000 - Begin phase construction'
FY 2001 - Complete phase construction
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: November 20, 1996 Department:Municipal Building Maintenance
Project Name: Flickinger Center Roof Replacement Y
Type of Project:
Planning or Design Equipment Purchase —
Site Acquisition Facility Construction J
or Repair
Description of Project /Services to be Provided:
Replacement of roof covering and insulation due to deterioration of existing
EDPM (rubber) roof surface. Numerous tears in the EDPM have been patched
in the last two (2) years. Flashing details are also begining to tear
creating additional potential leaks. Roofing needs to be replaced before
leaks occur and damage furnishing and equipment inside. The roof over the
Council Chambers and Senior Center were replaced in FY 96 and 97. The
re- roofing will include new insulation boards and cold process modified
bitumen roofing.
Anticipated Benefits:
Current roofs are showing advanced signs
and tears. Replacement of the roof before
building and contents from water damage.
Evaluation Criteria Met:
Systematic Replacement
of EDPM failure such as brittleness
catastrophic failure will protect[
Implementation schedule:
FY 1996 - Flat roof over main lobby and entry corridors
FY 1997 - Shingle roof over Council Chambers and Senior Center
FY 1998 - Flat roofs over the Police Department .
FY 1999 - Flat roof over Village Hall.
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
)ate: November 20, 1996 Department: Municipal Building Maintenance
Project Name: Flickinger Center Roof Replacement
- Construction Cost -
Construction Cost Basis of estimate:
(—,Bids Received Engineer, Architect, R or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: 11 -20 -96 FY 1999 estimate includes 5% inflation escalator.
Police Dept roof bid opening is 12/06/96 for work to be completed FY 98.
Financing Other Than Property Tax:
Impact on Operating Costs:
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
Construction
$21,166
$88,000
$39,700
$127,700
/Repair
Misc.
Total
$21,166
$88,000
$39,700
$127,700
Construction Cost Basis of estimate:
(—,Bids Received Engineer, Architect, R or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: 11 -20 -96 FY 1999 estimate includes 5% inflation escalator.
Police Dept roof bid opening is 12/06/96 for work to be completed FY 98.
Financing Other Than Property Tax:
Impact on Operating Costs:
village of Morton Grove - Capital improvement Program
PROJECT DESCRIPTIOPI
Date: November 20 1996 Degartment:Munic pal Building Maintenance
I
Project Name: Flickinger Center Roof Replacement
I
I
Type of Project:
Planning or Design J Equipment Purchase J
Site Acquisition Facility Construction —�
or Repair
Description of Project /Services to be Provided:
Replacement of roof covering and insulation due to deterioration of existing
EDPM (rubber) roof surface. Numerous tears in the EDPM have been patched
in the last two (2) years. Flashing details are also begining to tear
creating additional potential leaks. Roofing needs to be replaced before
leaks occur and damage furnishing and equipment inside. The roof over the
Council Chambers and Senior Center were replaced in FY 96 and 97. The
re- roofing will include new insulation boards and cold process modified
bitumen roofing.
d
Anticipated Benefits:
Current roofs are showing.advanced signs of EDPM failure such as brittleness
and tears. Replacement of the roof before catastrophic failure will protect
building and contents from water damage.
Evaluation criteria Met:
Systematic Replacement
Implementation Schedule:
FY 1996 - Flat roof over main lobby and entry corridors
FY 1997 Shingle roof over Council Chambers and Senior Center
FY 1998 - Flat roofs over the Police Department .
FY 1999 - Flat roof over Village Hall.
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 20, 1996 Department: Municipal Building Maintenance
Project Name: Flickinger Center Roof Replacement
- Construction Cost -
Construction Cost Basis of estimate:
Bids Received Engineer, Architect, X
or Vendor Estimate
Comparable Facility Cost 0
Standard Cost -
Chicago Area
Date of
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Police
Dept roof
bid opening
is 12106/96
for
work to
be
Total
Planning/
Design
Site
Acquisition
Eauipment
Construction
$21,166
$39,700
$106,450
/Reuair
Misc-
(�// `
c*
r
Total
$21, 166
;'93fl4
$39, 700
$106,450
Construction Cost Basis of estimate:
Bids Received Engineer, Architect, X
or Vendor Estimate
Comparable Facility Cost 0
Standard Cost -
Chicago Area
Date of
Estimate:
11 -20 -96 FY
1999
estimate
includes
5%
inflation
escalator.
Police
Dept roof
bid opening
is 12106/96
for
work to
be
completed
FY 98.
Financing Other Than Property Tax:
Impact on Operating Costs:
village of Morton Grove - Capital improvement_ Program
PROJECT DESCRIP'TT_ON
Date:November 20 1996 Department: Municipal Building Maintenance
Project Name: Pnhli(- Work-, Earking Lot R s, facing
Type of Project:
Planning or Design ❑ Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project /Services to be Provided:
The rehabilitation of the front, and rear lots of the Public Works yard.
The front yard is to have bituminous surface removed, the existing base
recompacted, drainage structure adjustments, and 4" of new bituminous
surface constructed.
The rear yard is to have the bitimnous surface removed, approximately
50% of the lot is to be excavated to a depth of 10" with new aggregate
installed and compacted, drainage structure adjustments and 6" of new
J bituminous surface constructed. The work in the rear lot is extensive due
to the amount of heavy equipment (semi- trucks, loaders, sweepers, etc.)
that use this lot on a daily basis.
Anticipated Benefits: (Increase in Service; Reduction in Cost):
Reduction in maintenance required by Public Works (patching).
Improved drainage characteristics.
Evaluation Criteria Met:
Deteriorated Facility -- Reconstruction of Parking Lot.
Reduction of maintenance costs.
Implementation Schedule:
Bid Documents Available
Sign Contract
Initiate Construction
Complete Construction
Front Public Works Lot
June 1997
July 1997
August 1997
October 1997
Rear Public Works Lot
March 1yy25
April 1998
May 1998
July 1998
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 20, 1996 Department: Municipal Building Maintenance
Project Name: Public Works Parking Lot Resurfacing
- Construction Cost -
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost X Standard Cost
Chicago Area
Date of Estimate: October 1995 with 5% inflation escalator each year.
* Misc. - soil and material testing. A 0
Financing Other Than Property Tax:v C
V
U
Impact on Operating Costs:
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
Construction
$63,000
$231,525
$294,525
/Repair
Misc. *
2,500
5, DDD.
7,500
Total
$55,500
$236,525
$302, 025
Construction Cost Basis of estimate:
Bids Received Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost X Standard Cost
Chicago Area
Date of Estimate: October 1995 with 5% inflation escalator each year.
* Misc. - soil and material testing. A 0
Financing Other Than Property Tax:v C
V
U
Impact on Operating Costs:
Village of Morton Crove - Capital Improvement Program
PROJECT DESCRIPTION
Date:November 25, 1996 Department: Municipal Building Maintenance I
Project Name: Remodel Office Area At Public Works k
Type of Project:
Planning or Design F7 Equipment Purchase
Site Acquisition Facility Construction
or Repair
Description of Project /Services to be Provided:
Renovation of employee locker rooms, lunch room, offices, and washrooms to
provide a more efficient use of space. A.D.A. compliance will be addressed
and the office entrance will be redesigned for energy conservation.
Anticipated Benefits:
Improved locker room and lunch room facilities for public works crews
which may use these facilities for extended hours during winter storms
and other natural disasters. More efficient use of the office space for
department supervisors, and improved washrooms, especially for female
employees.
Evaluation Criteria Met:
Improvement of operating efficiency
Equitable provision of facilities
Implementation Schedule:
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
(`A "!date: November 25, 1996 Department: Municipal Building Maintenance
Project Name: Remodel Office Area at Public Works
- Construction Cost -
Construction Cost Basis of estimate:
1
Bids Received Engineer, Architect, X
or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: November 25, 1996
Financing Other Than Property Tax:
Impact on Operating Costs:
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date_
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$ 5,000
$ 5,000
Design
Site
Acquisition
Equipment
20,000
20,000
Construction
125,000
125,000
. /Repair
Misc.
Total
$150,000
$150,000
Construction Cost Basis of estimate:
1
Bids Received Engineer, Architect, X
or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: November 25, 1996
Financing Other Than Property Tax:
Impact on Operating Costs:
village of Morton Grove - Capital Improvement P ogram
PROJECT DESCRIPTION
Date:November 25, 1996 Department: Municipal Building intp=cp
% I
Project Name:
Type of Project:
Planning or Design Equipment
Site Acquisition Facility C
or Repa
ion
Description of Project/Services'•to be Provide :
Renovation of employee locker room, lunch roo offices, and washrooms to
provide a more efficient use of space A.D.A./compliance will be addressed
and the office entrance will be redesigned for energy conservation.
Anticipated Benefits:
Improved locker room and lunch
which may use these facilities
and other natural disasters. M
department supervisors, and ipi
employees. 7
Evaluation Criteria Me
Improvement of operating
Equitable provision of /1
UImplementati
m facilities for pub\kic works crews
extended hours duringi winter storms
efficient use of the o�fice space for
ed washrooms, especially for female
'efficiency
acilities
Schedule:
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 25, 1996 Department: Municipal Building Maintenance
Project Name: Remodel Office Area at Public Works
- Construction Cost -
Construction Cost Basis of estimate:
i n
Bids Received
Comparable Facility Cost
Engineer, Architect, �X
or Vendor Estimate L
Standard Cost -
Chicago Area
Date of Estimate: November 25, 1996 _
Financing Other Than Property Tax:
Impact on Operating Costs:
4
Ab
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
$ 5,000
$ 5,000
Design
Site
Acquisition
Equipment
20,000
20,000
Construction
125,000
125,000
/Repair
Misc.
Total
$150,000
$150,000
Construction Cost Basis of estimate:
i n
Bids Received
Comparable Facility Cost
Engineer, Architect, �X
or Vendor Estimate L
Standard Cost -
Chicago Area
Date of Estimate: November 25, 1996 _
Financing Other Than Property Tax:
Impact on Operating Costs:
4
Ab
71illage of Morton Grove - Capital Improvement Pr_gram
I
PROJECT DESCRIPTION
Date: November 20, 1996 Department: Municipal Building Maintenance
Project Name: Emergency Generator Fire Station 5
I
Type of Project: �I
Planning or Design Equipment Purchase
Site Acquisition ❑ Facility Construction
or Repair
Description of Project /Services to be Provided:
Furnish and install new emergency generator and automatic transfer switch.
New generator set is to include diesel engine, integral fuel tank, weather
enclosure. 30KW, 120/240 volt generator. Transfer switch is to be rated at
150 Amp.
I
Anticipated Benefits:
Generator and transfer switch were to be replaced as part of the building
renovation completed in 1996. New generator will have a larger KW capacity
to allow the fire station to remain fully functional during a power
failure.
Evaluation criteria Met:
Systematic Replacement
Improvement of operating efficiency - allows Fire Station 5 to remain
fully functional during a power failure.
Implementation Schedule:
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 20, 1996 Department: Municipal Building Maintenance
Project Name: Emergency Generator - Fire Station 5
- Construction Cost -
Construction Cost Basis of
Cost to
FY
FY
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Chicago Area
Total
Planning/
includes
5% inflation escalator
each year.
Design
site
Acquisition
Equipment
Construction
$30,700
$30,700
/Repair
Misc.
Total
$30,700
$30,700
Construction Cost Basis of
estimate:
Bids Received
I
Engineer, Architect,
1X
—I
or Vendor Estimate
Comparable Facility Cost
Standard Cost -
Chicago Area
Date of Estimate: 10/31/96
includes
5% inflation escalator
each year.
Financing Other Than Property Tax:
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
\� PROJECT DESCRIPTION
it
Date: November 20, 1996 Department: Municipal Building Maintenance
I
Project Name: Replace Roof Over Apparatus Bays and Crew Quarters
Type of Project:
Planning or Design Equipment Purchase —
Site Acquisition Facility Construction X -
or Repair
Description of Project /Services to be Provided:
Remove existing tar and gravel roofing and insulation boards. Replace with
new insulation boards and modified bitumen roofing. Area of roofing to
be replaced is approximately 7,100 square feet.
Village of Morton Grove - Capital Improvement Program
PROJECT,COST SUMMARY
Date: November 20, 1996 Department:' Municipal Building Maintenance
Project Name: Replace Roof Over Appartus Bays and Drew Ouarters at Fire
- Construction Cost -
Construction Cost Basis of estimate:!
Bids Received F1 Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost Standard Cost - u
Anticipated Benefits: i' Chicago Area
Roof was originally to be replaced as part of building renovation.
Date of Estimate: 11/01/96 includes 5% inflation escalator each
Current roof has exceeded its normal anticipated useful life.
Financing Other Than Property Tax:
Evaluation Criteria Met:
Systematic Replacement.
i
Impact on Operating Costs:
Implementation Schedule:
Cost to
FY
FY'.
FY
FY
FY
FY 1998 -
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
I
Equipment
Construction
$61,800
$61,800
/Repair
Misc.
Total
$61,800
$61,600
Construction Cost Basis of estimate:!
Bids Received F1 Engineer, Architect,
or Vendor Estimate
Comparable Facility Cost Standard Cost - u
Anticipated Benefits: i' Chicago Area
Roof was originally to be replaced as part of building renovation.
Date of Estimate: 11/01/96 includes 5% inflation escalator each
Current roof has exceeded its normal anticipated useful life.
Financing Other Than Property Tax:
Evaluation Criteria Met:
Systematic Replacement.
i
Impact on Operating Costs:
Implementation Schedule:
Y
�Iillage of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: November 20, 1996 Department_MuniciT)al Building Maintenance
Project Name: Replace Roof at Fire Station 5
Type of Project:
Planning or Design — Equipment Purchase —
i
Site Acquisition = Facility Construction X'
or Repair
Description of Project /Services to be Provided:
Remove existing asphalt shingles and replace with new shingle roof.
Anticipated Benefits:
Roof was originally to be replaced as part of the building renovation j
completed in 1996. Due to the low pitch roof, the shingles are nearing the
end of their normal anticipated useful life.
Evaluation Criteria Met:
Systematic Replacement.
Implementation Schedule:
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November 20, 1996 Department: Municipal Building Maintenance
Project Name: Re -roof Fire Station 5
- Construction cost -
Construction Cost Basis of
Cost to
FY
FP
FY
FY
Fv
FY 1998 -
Cost Elements
Date
1998
1999,
2000
2001
2002
FY 2002
FX
or Vendor Estimate
Total
Planning/
Comparable Facility`Cost
Standard Cost -
! 1
Design
Date of Estimate: 11/01/96
includes
5% inflation escalator
each year.
sire
Acquisition
Eauinment
Construction
$15,900
S15,900
Misc.
Total
X15,900
$15,900
Construction Cost Basis of
estimate:
Bids Received
F1
Engineer, Architect,
FX
or Vendor Estimate
Comparable Facility`Cost
Standard Cost -
! 1
Chicago Area
Date of Estimate: 11/01/96
includes
5% inflation escalator
each year.
Financing Other Than Property Tax
Impact on Operating Costs:
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
12-18-96
Date: Department: Municipal Building MAintenAnrp
Project Name: Weather Cover for Material Storage Bins at Public Works
Type of Project:
Planning or Design ED : Equipment Purchase —
Site Acquisition --
Facility Construction
or Repair
Description of Project/Services to be Provided:
Excess road salt or other weather sensitive materials are stored in the
concrete bunkers at the Northeast corner of the Public Works yard.
Currently material is lost due to the exposure to the weather . This
project would provide side walls above the existing concrete walls
to create an opening height of 20 feet to accommodate salt trucks and
a sloped roof; The south face would remain open.
Anticipated Benefits:
Reduce loss of material to weather conditions
Evaluation Criteria Met:
Improvement of operating efficiency
Implementation Schedule:
FY 1998
CAP-:MPR\9IMAAL
10iN'
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 12-18-96 Department: Municipal Building Maintenance
Project Name:Weather Cover for Material Storage Bins at the Public Works
- Construction Cost -
Cost Cost ^ FY FY FY FY FY FY :;;e -
Elements Date 1998 1995 20D3 2001 22:2 FY 2222
Total
Planning/
Design
Site
Acquisition
Equipment
Construc-
tion/Repair 20 . 000 20, 000
Misc.
Total
20, 000
Basis of Construction Cost Estimate:
Engineer, Architect, R--
Bids Received 0 or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: 12-18-96
Financing Other Than Property Tax:
Impact on Operating Costs:
-, '-
TA]-:NPR.37:AV':AL .
Village of Morton Grove - Capital Improvement Program
.r%v%,O%-r"CT DESCREPTION
JPAUU ri U 0 K.Lr_1:.LVV
nates. 06 Nov 96 Department: POLICE
Description • Project/Services to be Provided:
Implementation of a computer network to connect all computers within the
Police Department to grant access to each computer workstation computer
services available to the Morton Grove Police Department.
1%
"�,nticipated Benefits (Increase in Service,- Reduction in Cost):
Evaluation Criteria Mete.
Improvement of operating Efficiency
implementation Schedule:
Village of Morton Grove - Capital Improvement Program
Date: 06 Nov 96 Department: POLIC
Project Name: Computer Network
Additional maintenance agreement is needed. Cost is unknown at this time.
Cost to
FY
FY
FY
FY
FY
FY 1.998
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
$22,500
$22,500
Construction
misc.
Total
$22,500
$22,500
Construction Cost Basis
of estimate:
Bids Received
P
Engineer, Architect,
Ex
or Vendor Estimate
Comparable Facility Cost
0
Standard Cost
Chicago Area
Date of Estimate: 06
Nov 96
Additional maintenance agreement is needed. Cost is unknown at this time.
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
r-e: 05 Nov 96 Department: POLICE
Project Name: LiveScan Fingerprint Workstation
Description of Project/Services to be Provided:
LIVESCAN fingerprint processing provides the capability to roll inkless
fingerprint impressions, electronically store those images and transmit the
to the ILLINOIS STATE POLICE BUREAU OF IDENTIFICATION for identification an
cataloging. It will also access other identification databases such •
CHICAGO POLICE, COOK COUNTY SHERIFF'S POLICE and the FEDERAL BUREAU OF
IDENTIFICATION. I
Antic' ated Benefits (Increase in Service- Redu��tin_in Cost):
p I
Evaluation Criteria Mete.
New equipment for improvement in operating efficienc--m
YE
Implementation Scheduleee
.L..4 9 7
Village of Morton Grove - Capital Improvement Program
Date: 05 Nov 96 - Depar-Itment: POLICE
— -IMEMMWaingerprint Workstation
- Construction Cost I
Cost to
FY
FY
FY
FY
FY
FY 1998
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
$60,000
$50, 000
Construction
misc.
Total
rs
$50, 000
$60,000
Village of Morton Grove - Capital Improvement Program
PRU-JECT DESC; R I PrT II U0 N1
Date: 06 Nov 96 Department: POLICE
Project Name:- Mobile Data Tgrminal Replacement Procrram
RX&M WN
Evaluation Criteria Met:
Systematic Replacement and Improvement of Operating Efficiency"t
The replacement of the MDTs will give officers more reliable computers and
thereby increasing their operating efficiency by speeding up the processing
• incidents.
Implementation Schedule:
Village of Morton Grove - Capital Improvement Program
Date: 0• Nov 1996
PROJECT COST SITFUM-CRY
Department: POLICE
Project Name: Mobile Data Terminal Replacement Program
- Construction Cost -
Cost Elements
Cost to
FY
F, Y
FY
FY
FY
FY 1998
Date
1998
1999
2000
2001
2002
FY 2002
Tor-a!
Planning/
Design
Site
Accruisition
Equipment
$11,000
$27,500
$11,000
$5,500
$5,500
$60,500
Construction
Misc.
Total
$11,000
$27,500
$11,000
$5,500
$5,500
$60,500
IMMMMITM
Date of Estimate: 06 Nov 1996
Financing ax:
Operating budget.
r
Maintenance agreement will be needed. Cost vary from year to year but could
be absorbed in the Police operating budget.
Village of Morton Grove- Capital Improvement Program
PROJECT DESCR.&T
PTL ION
nate: 05 Nov 96 Department: POLICE
Project Name: DAREICrime PrgventioniMobile Command Center -.-I
Description of Project/Services to be Provided: I
Anticipated Benefits (Increase in Service; Reduction in Cost):
in we are only replacing this vehicle every 5-6 years, projected yearly
cost is roughly $5,000.00.
Evaluation Criteria Met.e
Systematic replacemen i
t. Ths vehicle will the existing DARE van
that is deteriorating with age. It will also replace become a dual purpose vehicLI
thereby, eliminating the need to buy two vehicles to accomplish different
tasks.
mplementation Schedulee,
Village of Morton Grove - Capital Improvement Program
PIPIOJECT CUCST SUTPRVIARY
*ate of Estimate: 05 Nov 1991
Operating budget.
Routine maintenance of the vehicle which Public Works should be able to
absorb in their operating budget®
Village of Morton Grove - Capital Improvement Program
P R 0 UT E CT D E S C R I it, T 10 14
-,te-0 05 Nov 96 Department® POLICE
Opproject Name: Public SafetylAnimal Control Vehicle
Description of Project/Services to be Provided:
A 1999 Chevrolet full-size extended cab pick-up truck with cap.
"'.1ticipated Benefits (Increase in Service; Reduction in Cost).-
.4
Evaluation Criteria Mete.
Systematic replacement: The vehicle will replace the current Animal Control
vehicle.
Implementation Schedule.-
1999
Village of Morton Grove - Capital Improvement Program
Al
Department: POLICE
Project Name: Public SafetyZAnimal Control Vehicle
- Construction Cost -
Construction Cost Basis of estimate:
Routine maintenance of the vehicle which Public Works should be able to
absorb in their operating budget.
Cost to
FY
FY
FY
FY
FY
FY 1998
Cost Elements
Date
1.998
1999
2000
2001
2002
FY 2002
Total
Planning/
Desicrn
Site
Acquisition
Equipment
$18,000
$18,000
Construction
Misc.
Total
$18,000
$18,000
Construction Cost Basis of estimate:
Routine maintenance of the vehicle which Public Works should be able to
absorb in their operating budget.
Village of Morton Grove - Capital Improvement Program
PROJECT DLfE"SCRTDMTOW
AI
Date: 05 Nov 96 Department: POLICE
Project Name: Automatic Vehicle Locator System
Description of Project/Services to be Provided:
An tomatic Vehicle Locator (AArL.) system t-r-acks the current position of
patrol units via the Global Positioning Satellite operated by the Federal
government. A transmitter is installed in the vehicle which sends out a
sianal to the satellite which transmits the coordinates of the vehicle to a
CAD system • similar software.
*Note.* Project might be abandoned depending on results of feasibility
studies being conducted on a Central Fire/Police Emergency
Dispatch Center.
Anticipated Benefits (Increase in Service; Reduction in Cost):
Evaluation Criteria Meto
Improvement in operating efficiency: as described above and is an
introduction to state of the art public safety technology.
Implementation Schedule:
Village of Morton Grove - Capital Improvement Program
P 1,'Zt_"',%JTECTL ("110S TL SUMMARY
Date: 05 Nov 96 Department: POLICE
Project Name: Automatic Vehicle Locator S stem
- Construction cost -
V
Additional or upgraded maintenance agreement will be needed. Cost is
unknown at this time.
Cost to
FY
FY
FY
FY
FY
FY 1998
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment
$87,171
$67,171
Construction
Misc.
Total
$87,171
$87,171
V
Additional or upgraded maintenance agreement will be needed. Cost is
unknown at this time.
Village of Morton Grove - Capital Improvement Program
PROjECT DESCRIPTION
ate: 05 Nov 96 Department: POLICE
Svstem (CAD)
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: 05 Nov 96 Department: POLICE
Project Name: Computer Aided Dispatch System
Evaluation Criteria Met.*
IMPROVEMENT IN OPERATING EFFICIENCY: Lowered response times to requests for
emergency services, enhanced officer safety by means of communicating all
pertinent information about the incident and reduction of redundant tasks to
process and log incidents into the data system.
Implementation Schedule:
Additional or upgraded maintenance agreement will be needed. Cost is
unknown at this time.
- Construction Cost -
Cost to
FY
FY
FY
FY
FY
FY 1998
Cost Elements
Date
1998
1999
2000
2001
2002
FY 2002
Type of Projects.
Total
Planning or Design
Equipment Purchase
Planning/
Design
Site
Site Acquisition
Facility Construction
Acquisition
or Repair
Equipment
5238,350
'3238,350
Description of Project/Services to be Provided:
Construction
A CAD system is a state of the art dispatching system for emergency
misc.
services. It computerizes the basic functions of the dispatcher, such as
the assignment of units and conveying pertinent information to the units
Total
$238, 350
$238,350
i
assigned.
Construction Cost Basis
of estimate:
to e: Project might be abandoned depending on results of feasibility
studies being conducted on a Central Fire/ Police Emergency
Bids Received
E� En gineer, Architect,
Ex-
Dispatch Center.
or Vendor Estimate
Comparable Facility Cost
Standard Cost
Anticipated Benefits (Increase in Service* Reduction in Cost).*
1
Chicago Area
CAD systems transmit information faster to the units out in the field and
Date of Estimate: 05
Nov 96
reduces radio transmissions thereby reducing chances that sensitive
information will be monitored by frequency scanners. It results in
redundant data entry thereby reducing the amount of time to process and log
incidents into the data system.
Financin Other `Phan Pro
arty T'a:
Evaluation Criteria Met.*
IMPROVEMENT IN OPERATING EFFICIENCY: Lowered response times to requests for
emergency services, enhanced officer safety by means of communicating all
pertinent information about the incident and reduction of redundant tasks to
process and log incidents into the data system.
Implementation Schedule:
Additional or upgraded maintenance agreement will be needed. Cost is
unknown at this time.
Village of
Morton Grove -
Capital Improvement
Program
U
- _--Tents
PROJECT
DESCRIPTION
1:99
Date: November, 1996
Department:
PUBLIC WORKS
IV
Project Name: Asphalt
Paving of
Alleys
1
Type of Project:
Planning or Design
®
Equipment Purchase
Site Acquisition
Facility Construction
El
an
or Repair
Description of Project /Services to be Provided:
The Public Works Department has implemented an asphalt paving program to
transform stone alleys into asphalt alleys.
Attached is a sheet designating the petitioned alleys to be done.
Anticipated Benefits:
Eliminate many of the alley repair complaints and continual repair of
alleys with stone. A hard driving surface is easier to maintain. It
would be more cost effective by having Public Works crews to do the job.
Evaluation Criteria Met:
Risk to public health dust factor would be eliminated.
Coordination - project that meets established goals or objectives of
Trustees. Improvement of operating efficiency in
repair and snow plowing.
Implementation Schedule:
1997 -1998
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November, 1996 Department: PUBLIC WORKS
Project Name: Asphalt Paving of-Alleys
- Construction Cost -
Basis of Construction Cost Estimate:
Engineer, Architect,
Bids Received D or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: November, 1996
Financing Other Than Property Tax:
General Fund
Impact on Operating Costs:
No additional costs would be incurred-
to ?- 39:.A.Y'A:.
(d"
❑■
M
^Daze
- _--Tents
1998.
1:99
2J J0
2",
2- - -C2
?y " .2
= _anr.i ag/
an
Acquisition
II
Equipment
-
'-
I!
Constrlc-
I
:ion /Repair
229,772
109,000
113,360
117,894
122,610
127,514
590,378
Misc.
T
113,360
117,894
122,610
127,514
590,378
Basis of Construction Cost Estimate:
Engineer, Architect,
Bids Received D or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area
Date of Estimate: November, 1996
Financing Other Than Property Tax:
General Fund
Impact on Operating Costs:
No additional costs would be incurred-
to ?- 39:.A.Y'A:.
(d"
❑■
M
r
'
ALLEY PAVING
1.
WASHINGTON AND MAIN
CENTRAL EAS "I TO LINDER
2.
PARK31DE AND CENTRAL
MADISON NORTH
3.
MADISON TO WASHINGTON
MARMORA EAST,
4.
LINCOLN AND LEE
MANGO TO MENARD
5.
LAKE SOUTH
MASON AND MARMORA
6.
MOODY AND MEADE
GREENWOOD SOUTH
7.
DEMPSTER NORTH
MEADE AND MOODY
8,
AUSTIN AND MC VICKER
DAVIS NORTH
9.
CHURCH NORTH
BELLEFORT TO MARION
10.
CHURCH NORTH
NATIONAL TO SAYRE
11.
BECKWITH SOUTH
NATIONAL TO SAYRE
12.
NATIONAL AND SAYRE
BECKWITH TO CHURCH
13.
CHURCH NORTH
HARLEM TO MARION
14.
BECKWITH SOUTH
HARLEM TO MARION
15.
HARLEM AND MARION
BECKWITH TO CHURCH
16.
LUNA AND LINDER
DAVIS NORTH
V
Pn Y
0
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: November, 1996 Department: PUBLIC WORKS
Project Name: Equipment Replacement
Description of Project/Services to be Provided:
Following pieces of equipment to be replaced: FY 1998 _tt�35) 6 wheel dump
'.t X_u _qk k S2 street s w e e p e r #17 1 D i c. - u
cab t 9.r FY 19-9-9-(—#19) E_ndloader; (#22) snorkel;
'(#2) p-1--ci --- up; (#73) pick-up. FY 2000 (#10) 6 wheel dump truck; (#11) 6
wheel dump. truck; (#33) pick-up. FY 2001 (#12) 6 wheel dump truck;
(#25) 6 wheel dump truck; (#13) small dump truck; (#7) pick-up;
(#1) pick-up. FY 2002 (#72) End loader; (#4) pick-up; (#5) pick-up;
(#15) dump truck; (#20) pick-up; (#56) pick-up.
Anticipated Benefits:
Continue the services provided to the residents, reduction in costs in
maintaining the older pieces of equipment.
Evaluation Criteria Mete.
Meet established goals or objectives of the Board of Trustees; improving
operating efficiency. Systematic replacement of equipment.
Implementation Schedule:
Fiscal year 1998
CAP -:.MP.q%)7MA-`C%:AL
Village of Morton Grove - capital Improvement Program
PROJECT COST SUMMARY
Date: November, 1996
Department:
PUBLIC WORKS
Project Name: Equipment Replacement
- Construction Cost -
'/ .r 71 =7
Cost FY -Z
Date 999. 1935 2030 2 i 2 2
S I gn.
Site
Acquii.sition
Equipment 2 9 2 29'9 ,000 1187,000
1 320, 597 0 , 00 1 * 1250,000 1 291 000 1 1 317,200
construc-
tion/Repair
Misc.
0
Total 1320,597 11290,200 1299,000 1 1250,000 1 11,317,200
Basis of Construction Cost Estimate:
Engineer, Architect,
Bids Received E__1 or Vendor Estimate
El
Comparable Facility Cost Standard Cost
Chicago Area
Date of Estimate: November, 1996 ___
Fina ncin r T tY Tax :
Revolving Equipment Fund
Water & Sewer Fund
Impact on operating Costs:
I No additional costs would be incurred
A P - - M P q'. 4 7 NtASU A:,
Village of Morton Grove - capital Improvement Program
PROJECT DESCRIPTION
Date: November, 1996 Department: PUBLIC WORKS
Project Name: Corrosion Control - EPA Lead & Copper Mandates
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition El Facility Construction
or Repair
Description of Project/Services to be Provided:
Corrosion Control
If recommended by State EPA
Engineering $10,500
Equipment & installation for two pumping stations $25,200
Chemicals for the two pumping stations $3,150
Anticipated Benefits:
To reduce or eliminate the lead/copper corrosion within the service lines
and houses to meet USEPA & IPA Standards.
A safer drinking water for the consumer.
Evaluation Criteria Met: I
Risk to public safety and health
Coordination - a project that is necessary to comply with the requirements
imposed by others.
Implementation Schedule:
Fiscal year 1998
:A? - :M?R'\ ) 7MANr,.:A.:-
i :
Village of Morton Grove - Capital Improvement Program
Date: November, 1996
PROJECT COST SUMMARY
Department:
PUBLIC WORKS
Project Name: Corrosion Control - EPA Lead & Copper Mandates
- Construction Cost -
Basis of Construction Cost Estimate:
F.7-WARTIZEFI-ATrolrol
Additional costs would incur due to the purchase of chemicals on a
yearly basis®
:A P - : M P R ", ) 7
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: November, 1996 Department: PUBLIC WORKS
Project Name:
Update Fuel Storage to EPA Standards
Description of Project/Services to be Provided:
Install leak detection, spill overflow prevention system. These would be
installed on the 12,000 gallon gasoline tank and on the 10,000 gallon
diesel storage tank. Also, 2 new fuel dispensers would be installed.
These should be taken care of by December, 1998.
To be in compliance of EPA guidelines. The improvement would make the tanks
safer and they would automatically be monitored daily. The over spill
devices would protect the environment.
Evaluation Criteria Met**
Coordination - project is necessary to comply with requirements imposed by
others.
Implementation Schedule:
Fiscal year 1998
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November, 1996 Department: PUBLIC WORKS
Project Name: Update Fuel Storage to EPA Standards
- Construction Cost
.y Y
E I -- T.. e n t s Da::e 1999. 1IZ99 21-100 2v01 2-i--2
No additional costs would be incurred but every five years tanks would
have to be retested.
-A P - :.M P R 7%xkWAL
:!AP- ---MPR% 17MANUAL
V gage of Morton G r D v e Capi-ta' Improvement Program
PROJECT DESCRIPTION
Date: November, 1996 Department: PUBLIC WORKS
Project Name: Separation of Storm Water from Combination Sewers
Type of Project:
Planning or Design
Site Acquisition
Equipment Purchase
El Facility Construction ❑
or Repair
Description of Project/Services to be Provided:
South Central neighborhood. Separate storm water from combination sewer
system. Sewer construction work will be done by Public Works employees.
Georgiana sewers to be separated because street is.due for reconstruction
in 1998.
Row- SM
Evaluation Criteria Met**
Coordination - risk to public safety and health
Implementation Schedule:
FY 1998 - Georgiana - Capulina North*to Dempster
FY 1999 - Mason - Lincoln to Southpark
FY 2000 - Marmora Lincoln to Southpark
FY 2001 - Menard Lincoln to Theobald
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November, 1996 Department: PUBLIC WQar,-q.
Project Name: Separation of Storm Water from Combination Sewer,
- Construction Cost -
S�e^°ents dare =-or
FY
:I i 3 ry 1,-: -
19 913 i 2-'100 2 2
96,000 1 96,000 (96,000 1 1 480,000
• additional costs will be incurred,
CAP- :.MP.q*, )7%VQA-;A:- CAP - :MPq )'7M-A-WAL
A.-
S gr
S I
Acquisition
Equipment
Conszruc-
,- ion/Repair
199000
,
96,00-0 1
Misc.
Total
199,000
0
96 , 000
96,000 1 96,000 (96,000 1 1 480,000
• additional costs will be incurred,
CAP- :.MP.q*, )7%VQA-;A:- CAP - :MPq )'7M-A-WAL
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: December 1996 Department: Public Works
Project Name: Update Waste Oil Storage to EPA Standards
Type of Project:
Planning or Design Equipment Purchase
Site Acquisition Facility Construction X
or Repair —
Description of Project/Services to be Provided:
The Public Works Department possesses a 5000 gallon waste oil storage tank.
We would like to abandon the tank as it is encased in the concrete floor. In
its place a 280 gallon double walled tank and a 500 gallon waste oil tank
would be installed.
To be done by December of 1998.
Anticipated Benefits (Increase in Service; Reduction in Cost) :
To be in compliance with EPA regulations
Evaluation Criteria Met:
Coordination - project is necessary to comply with requirements imposed by
others.
Implementation Schedule:
FY 1999
CAP-IMPR\97PUBLIC.WRK
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
)ate: December 1996 Department: Public Works
Project Name: Update Waste Oil Storage to EPA Standards
- Construction Cost -
Cost to FY FY FY FY FY FY 1998 -
Cost Elements Date 1998 1999 2000 2001 2002 FY 2002
Total
Planning/
Design
Site
Acquisition
Equipment $2, 065 $23, 858 $23, 858
Construction
Misc.
Total $2, 065 $23, 858
$23,858
Construction Cost Basis of estimate:
\.Bids Received Engineer, Architect, X
or Vendor Estimate
Comparable Facility Cost Standard Cost -
Chicago Area —
Date of Estimate: November 1996
Cost estimates are in 1996 dollars with no increase for inflation.
Financing Other Than Property Tax:
General Fund
Impact on Operating Costs:
There could be additional costs imposed on this project depending on the
amount of oil to be disposed and time to pump it up. Clean up costs if soils
are contaminated.
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Date: November, 1996 Department: PUBLIC WORKS
Project Name: Update_ Storage to EPA Standards
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUMMARY
Date: November, .1996 Department: PUBLIC WORKS
Project Name: Update F_14a-� Storage to EPA Standards
To be in compliance with EPA regulations
Evaluation Criteria Met:
Coordination - project is necessary to comply with requirements imposed
by others.
Implementation Schedule:
General Fund ( P`
There could be additional costs imposed on this project depending on the
amount of oil to be disposed and time to pump it up. Clean up costs if
soils are contaminated.
::A? - a 7MA.1MAL "A P - : M 2 R , ? 7%,WWAL
Construction Cost
Type of Project:
CCS7: zo
FY
7 V
Planning or Design
Equipment Purchase
e"C:s
'
9 9 9.
2 1-100
2 ^0.
2 2
z y
Site Acquisition
Facility Construction
or Repair
Design
si-e
Acau4.sition
Description of Project /Services to
be Provided:
Tcluinment
2 065
23 858
23,858
Construc-
The Public Works Department possesses
a 5000 gallon waste oil
storage
Lion /Repair
tank. We would like to abandon the
tank as it is encased in the
concrete
misc.
floor. In its place a 280 gallon double
walled tank and a 500
gallon
waste oil tank would be installed.
Total
2 065
23 8 58
23 858
To be done by December of 1998.
-
Basis of Construction Cost
Estimate:
Engineer, Architect,
Bids Received
or Vendor Estimate
E]
Comparable Facility
Cost
Standard Cost -
El
Anticipated Benefits:
Chicago Area
Date of Estimate:
November-,-1996
To be in compliance with EPA regulations
Evaluation Criteria Met:
Coordination - project is necessary to comply with requirements imposed
by others.
Implementation Schedule:
General Fund ( P`
There could be additional costs imposed on this project depending on the
amount of oil to be disposed and time to pump it up. Clean up costs if
soils are contaminated.
::A? - a 7MA.1MAL "A P - : M 2 R , ? 7%,WWAL
Village of Morton Grove - Capital Improvement Program
PROJECT DESCRIPTION
Village of Morton Grove - Capital Improvement Program
PROJECT COST SUT1,MRY
Date: November, 1996
Department:- PUBLIC WORKS
Churchill
Date: November, 1996
Department:
PUBLIC WORKS
FY
2001
Davis
FY
Project Name: Sewer
Rehabilitation
Project Name: Sewer
Rehabilitation
Construction Cost -
Type of Project:
Cost:
S : -_z)
FY
2C130
2 0 1
Planning or Design
Equipment Purchase
Site Acquisition
Facility Construction
<i-g/`
or Repair
n-e 4
Acquisition
Description of Project/Services to be Provided:
Insituforming or lining
storm sewer lines on Churchill, Lake,
Davis, and
0 n S t- ru C -
188,900
174,100
1167,800
180,300
711,100
Arcadia to stop leakage
ater which may sanitary
of winfiltrate
sewer
/Repair
lines.
misc.
Total
188,900
174,100
1167,800 1180)300
711,100
Basis of Construction Cost Estimate:
❑
Engineer, Architect,
❑
Bids Received
or Vendor Estimate
Comparable Facility Cost
Standard Cost
Anticipated Benefits® ®
Chicago Area
Date of Estimate: November, 1996
Stoppage of rain water
from entering sanitary lines to try and
prevent
future basement flooding.
Fina
Tax:
Evaluation Criteria Mete.
Coordination - goals of Board of Trustees & Village Administrator.
Deteriorated facility - extend storm sewers' life expectancy.
Risk to public safety & health - flooding basements from sanitary water.
Implementation Schedule*-
FY
1999
Churchill
Fy
2000
Lake
FY
2001
Davis
FY
2002
Arcadia
Sewer User fee
No additional costs would be incurred.
:A? CAP - :`APR`, 37MA.YrUAL
Village of Morton Grove Capital improvement Program
Date: November, 1996
PROJECT DESCRIPTION
Department:- PUBLIC WORKS
Project Name: Replacement of Pumps at North Pumping Station
Type of Project:
Planning or Design Q Equipment Purchase ❑
Site Acquisition Facility Construction FX1
or Repair
Description of Project/Services to be Provided:
There are 4 pumps that pump water to the consumers located at the North
Pumping Stati'on. Beginning with the year 2001 one pump will be
rehabilitated each year until all the Pumps are done.
0
IM"Tal-TOMW
The rehabilitation of the pumps would increase its proficiency, increase
the pumping capaciy and help reduce electric costs.
Evaluation Criteria Met.*
Systematic rehabilitation to provide some level of service.
Coordination-a project that meets established goals or objectives
of the Board of Trustees.
Improvement of operating efficiency.
Implementation Schedule:
Y 2001 to FY 2005
Z A 2 - :.M P R', A,r%: A:-
Village of Morton Grove - Capital Improvement Program -
Date. November, 1996
PROJECT COST SUMMARY
Department: PUBLIC WORKS
Project Name: Replacement of Pumps at North Pumping Station
- Construction Cost -
Basis of Construction Cost Estimate:
Bids Received El
Comparable F . acility Cost El
Date of Estimate: November, 1996
Impact on Operating Costs:
Engineer, Architect,
• Vendor Estimate Q
Standard Cost
Chicago Area
Lower electric bills by improving performance of pumps.